Low Power / UPF · All levels

PD & Power Grid Integration

Domain-aware grid planning, IR stability across mode transitions, signoff dashboards, and PD/UPF handoff governance.

Section goal

Domain-aware grid planning, IR stability across mode transitions, signoff dashboards, and PD/UPF handoff governance.

How to study this section

  1. Start with each topic hub and sketch the domain/state model.

  2. Use mechanism and reports pages to connect policy intent to evidence.

  3. Practice debug and worked-example pages for review readiness.

  4. Close with checklist and silicon impact before signoff discussions.

Topics

  1. domain-grid-partitioning/ — Domain Grid Partitioning

  2. mode-transition-ir/ — Mode Transition IR

  3. upf-signoff-dashboard/ — UPF Signoff Dashboard

  4. power-pd-handoff/ — Power / PD Handoff

Related topics

Low-power deep dive

Mode transition IR and ownership clarity determine tapeout confidence.

Concept diagram

diagram
GRID + TRANSITIONS

domain partition -> staged wake -> transient IR -> signoff gate

Metric graph

diagram
TRANSIENT DROOP TREND

baseline       ███████
after staging  ████
after tuning   ██

Reports and artifacts

  • domain grid report

  • dynamic IR analysis

  • LP signoff dashboard

  • handoff owner matrix

Mini case study

Dynamic IR during wake-up, not static IR, was the true blocker for release.

Debug branches

  • Inspect transition waveforms

  • Check PMU schedule alignment

  • Escalate aged waivers

Senior review question

Ask: what transition evidence proves this topic is closed, and which owner signs it?

Execution drill pack 1

Use this pack to rehearse low-power closure on low-power/pd-power-integration: transition framing, policy ownership, implementation evidence, and release confidence.

Transition checklist

  • State transition explicitly named with legal source/target states.

  • Crossing and domain ownership are mapped and agreed.

  • Policy controls are traced to always-on source logic.

  • Waveform bookmarks align controls with state timestamps.

Review prompts

  1. Which policy object is first to deviate from intent?

  2. Which owner can apply the smallest reversible fix?

  3. What regression matrix proves no collateral damage?

  4. Which waiver conditions would still block release?

Evidence capsule

diagram
LP EVIDENCE CAPSULE 1

PATH: low-power/pd-power-integration
STATE WINDOW: <from -> to>
POLICY OBJECT: <isolation / retention / shifter / switch>
OWNER: <name>
PRIMARY ARTIFACT: <report/waveform/formal result>
RELEASE DECISION: <close / bounded waiver / escalate>

Execution drill pack 2

Use this pack to rehearse low-power closure on low-power/pd-power-integration: transition framing, policy ownership, implementation evidence, and release confidence.

Transition checklist

  • State transition explicitly named with legal source/target states.

  • Crossing and domain ownership are mapped and agreed.

  • Policy controls are traced to always-on source logic.

  • Waveform bookmarks align controls with state timestamps.

Review prompts

  1. Which policy object is first to deviate from intent?

  2. Which owner can apply the smallest reversible fix?

  3. What regression matrix proves no collateral damage?

  4. Which waiver conditions would still block release?

Evidence capsule

diagram
LP EVIDENCE CAPSULE 2

PATH: low-power/pd-power-integration
STATE WINDOW: <from -> to>
POLICY OBJECT: <isolation / retention / shifter / switch>
OWNER: <name>
PRIMARY ARTIFACT: <report/waveform/formal result>
RELEASE DECISION: <close / bounded waiver / escalate>

Execution drill pack 3

Use this pack to rehearse low-power closure on low-power/pd-power-integration: transition framing, policy ownership, implementation evidence, and release confidence.

Transition checklist

  • State transition explicitly named with legal source/target states.

  • Crossing and domain ownership are mapped and agreed.

  • Policy controls are traced to always-on source logic.

  • Waveform bookmarks align controls with state timestamps.

Review prompts

  1. Which policy object is first to deviate from intent?

  2. Which owner can apply the smallest reversible fix?

  3. What regression matrix proves no collateral damage?

  4. Which waiver conditions would still block release?

Evidence capsule

diagram
LP EVIDENCE CAPSULE 3

PATH: low-power/pd-power-integration
STATE WINDOW: <from -> to>
POLICY OBJECT: <isolation / retention / shifter / switch>
OWNER: <name>
PRIMARY ARTIFACT: <report/waveform/formal result>
RELEASE DECISION: <close / bounded waiver / escalate>

Execution drill pack 4

Use this pack to rehearse low-power closure on low-power/pd-power-integration: transition framing, policy ownership, implementation evidence, and release confidence.

Transition checklist

  • State transition explicitly named with legal source/target states.

  • Crossing and domain ownership are mapped and agreed.

  • Policy controls are traced to always-on source logic.

  • Waveform bookmarks align controls with state timestamps.

Review prompts

  1. Which policy object is first to deviate from intent?

  2. Which owner can apply the smallest reversible fix?

  3. What regression matrix proves no collateral damage?

  4. Which waiver conditions would still block release?

Evidence capsule

diagram
LP EVIDENCE CAPSULE 4

PATH: low-power/pd-power-integration
STATE WINDOW: <from -> to>
POLICY OBJECT: <isolation / retention / shifter / switch>
OWNER: <name>
PRIMARY ARTIFACT: <report/waveform/formal result>
RELEASE DECISION: <close / bounded waiver / escalate>

Execution drill pack 5

Use this pack to rehearse low-power closure on low-power/pd-power-integration: transition framing, policy ownership, implementation evidence, and release confidence.

Transition checklist

  • State transition explicitly named with legal source/target states.

  • Crossing and domain ownership are mapped and agreed.

  • Policy controls are traced to always-on source logic.

  • Waveform bookmarks align controls with state timestamps.

Review prompts

  1. Which policy object is first to deviate from intent?

  2. Which owner can apply the smallest reversible fix?

  3. What regression matrix proves no collateral damage?

  4. Which waiver conditions would still block release?

Evidence capsule

diagram
LP EVIDENCE CAPSULE 5

PATH: low-power/pd-power-integration
STATE WINDOW: <from -> to>
POLICY OBJECT: <isolation / retention / shifter / switch>
OWNER: <name>
PRIMARY ARTIFACT: <report/waveform/formal result>
RELEASE DECISION: <close / bounded waiver / escalate>