IP readiness quality, abstract model handoff, version governance, and top-level integration debug loops.
Start with the topic hub to learn the integration contract.
Use mechanism and reports pages to connect contract to metrics.
Use debug and worked-example pages for war-room readiness.
Close with checklist and PPA impact before closure signoff.
ip-handoff-readiness/ — IP Handoff Readiness
abstract-models-lef-def/ — Abstract Models (LEF/DEF/Timing)
integration-collateral-versioning/ — Integration Collateral Versioning
integration-bringup-debug/ — Integration Bring-up Debug
IP handoff quality and version governance drive integration velocity.
IP HANDOFF PIPELINE
IP package -> baseline lock -> integration build -> bring-upINTEGRATION CHURN
collateral gaps ██████
version drift █████
real logic bugs ███handoff completeness score
manifest diff report
model mismatch log
bring-up issue tracker
Most top-level debug time was spent on collateral drift, not RTL defects.
Validate handoff checklist
Lock manifest hashes
Correlate issue to owner boundary
Ask: what baseline, owner, and artifact prove this topic is truly closed?