Debug Playbook for AMS Signoff Dashboard focuses on cross-domain signoff readiness score, unresolved waivers, tapeout blockers. The goal is to connect observed symptom to boundary mechanism, ownership, and signoff risk.
AMS debug is a hunt for first divergence, not downstream symptom management. Most costly delays come from wrong-owner first actions.
ROOT-CAUSE TREE — AMS Signoff Dashboard
cross-domain signoff readiness score, unresolved waivers, tapeout blockers regressed
|
same silicon / run tags?
/ \
no yes
| |
env mismatch boundary contract or
tag mismatch true physical issue
/ \ |
clk reset isolate first failing
map sequence boundary transitionFreeze reproducer: mode, firmware/config, and evidence tags.
Find the first boundary signal that diverges.
Map divergence to contract clause and owner.
Classify failure: contract, sequencing, coupling, package, or tool-view mismatch.
Prove mechanism with one reduced reproducer.
Apply smallest reversible fix and rerun cross-domain regressions.
STAFF AMS REVIEW MEMO — Noise & IR at the Boundary / AMS Signoff Dashboard
1. Symptom
- Watched metric: cross-domain signoff readiness score, unresolved waivers, tapeout blockers
- Failing mode/condition: <power/clock/temp/workload>
- Boundary under suspicion: <macro/wrapper/interface/lane/island>
- Repro setup: <sim/emulation/lab + firmware/config tags>
2. Mechanism hypothesis
- Primary mechanism: A unified AMS dashboard ties timing, noise, IR, SI, PV, and bring-up evidence so release decisions are based on complete cross-team risk visibility.
- Competing hypothesis: <contract gap, sequencing, physical coupling, package, tooling>
- Missing evidence: <waveform, report, scope/analyzer capture, dashboard snapshot>
3. Proposed action
- Minimal reversible change: <RTL/config/layout/policy>
- Expected metric movement: <delta and conditions>
- Regression risk: timing, noise, power, performance, compatibility
4. Signoff
- Re-run artifact: AMS signoff dashboard, waiver tracker, release decision memo
- Required owners: signoff lead, program manager, AMS integration lead
- Final decision: fix, waive with controls, or escalateAMS signoff is a combined noise, IR, timing, and package decision.
BOUNDARY SIGNOFF
noise + IR + package + timing -> release decisionRISK DASHBOARD
open blockers █████
waivers ███supply ripple spectrum
IR around analog islands
package PI summary
release dashboard
IR hotspot at analog island caused jitter spikes only under burst traffic.
Correlate droop and jitter
Check package return path
Validate mode-specific activity profile
Ask: what boundary condition proves this topic is actually closed?
State boundary, mode, and evidence tag with every claim.
Always align analog, digital, and physical owners before signoff decisions.
Fixing averages while tails still fail.
Skipping package/supply evidence in jitter or SerDes issues.
Shipping with waivers that lack owner and expiration criteria.
A unified AMS dashboard ties timing, noise, IR, SI, PV, and bring-up evidence so release decisions are based on complete cross-team risk visibility.
Metric: cross-domain signoff readiness score, unresolved waivers, tapeout blockers