AMS Interface · All levels
Mixed-Signal Integration
Floorplan keepouts, guard rings, substrate control, and PV/DRC/LVS considerations for mixed-signal SoC integration.
Section goal
Floorplan keepouts, guard rings, substrate control, and PV/DRC/LVS considerations for mixed-signal SoC integration.
How to study this section
Start with topic hubs to learn contract and ownership.
Use mechanism and reports pages to map symptoms to root causes.
Use debug and worked-example pages for war-room practice.
Close with checklist and PPA pages before signing any change.
Topics
ams-floorplan-keepouts/ — AMS Floorplan Keepouts
guard-rings-substrate/ — Guard Rings & Substrate Control
abutment-rules/ — Abutment Rules
mixed-signal-pv/ — Mixed-Signal Physical Verification
Related topics
AMS deep dive
Physical proximity and boundary rules are functional constraints in AMS SoCs.
Concept diagram
INTEGRATION FLOW
floorplan keepouts -> guard strategy -> abutment policy -> PV signoffMetric graph
INTEGRATION ESCAPES
layout boundary issues ███████
waiver drift ████Reports and artifacts
keepout violations
guard-ring checks
abutment DRC
mixed-signal PV dashboard
Mini case study
Late macro move violated quiet-zone assumptions and caused intermittent converter noise excursions.
Debug branches
Review macro adjacency
Re-check guard assumptions
Re-run PV with correct deck variant
Senior review question
Ask: what boundary condition proves this topic is actually closed?