AMS Interface · All levels

Mixed-Signal Physical Verification: Step-by-Step Walkthrough

Step-by-Step Walkthrough for Mixed-Signal Physical Verification.

Step-by-step analysis walkthrough

Use this when you own Mixed-Signal Physical Verification during an AMS war room.

  1. Capture failing mode and environmental condition.

  2. Pull synchronized waveform, logs, and report artifacts.

  3. Mark first boundary where legal behavior diverges.

  4. Audit reset/clock/power sequence assumptions.

  5. Check physical coupling contributors (floorplan/power/package) where relevant.

  6. Assign single-thread ownership for the first fix.

  7. Propose bounded change and define success criterion.

  8. Run scenario and safety regressions.

  9. Document findings in closure memo.

  10. Update signoff dashboard and waiver state.

Artifacts to collect

  • PV signoff dashboard, LVS mismatch summary, waiver approvals

  • handoff contract

  • firmware/config tag

  • physical signoff snapshot

  • decision memo

Decision memo template

diagram
AMS DECISION MEMO — Mixed-Signal Physical Verification
mode/condition:
metric:
hypothesis:
fix:
regression:
owners: PV lead, analog layout owner, program signoff owner

Reference visuals

Mixed-signal PV closure

diagram
DRC + LVS + ERC + analog-specific checks
          -> waiver review
          -> AMS release gate

AMS deep dive

Physical proximity and boundary rules are functional constraints in AMS SoCs.

Concept diagram

diagram
INTEGRATION FLOW

floorplan keepouts -> guard strategy -> abutment policy -> PV signoff

Metric graph

diagram
INTEGRATION ESCAPES

layout boundary issues ███████
waiver drift           ████

Reports and artifacts

  • keepout violations

  • guard-ring checks

  • abutment DRC

  • mixed-signal PV dashboard

Mini case study

Late macro move violated quiet-zone assumptions and caused intermittent converter noise excursions.

Debug branches

  • Review macro adjacency

  • Re-check guard assumptions

  • Re-run PV with correct deck variant

Senior review question

Ask: what boundary condition proves this topic is actually closed?

Key takeaways

  • State boundary, mode, and evidence tag with every claim.

  • Always align analog, digital, and physical owners before signoff decisions.

Common pitfalls

  • Fixing averages while tails still fail.

  • Skipping package/supply evidence in jitter or SerDes issues.

  • Shipping with waivers that lack owner and expiration criteria.

Principal AMS review addendum

Mixed-signal PV combines digital and analog rule decks, LVS partition assumptions, and waiver discipline to achieve manufacturable signoff.

Metric: AMS PV closure rate, signoff waiver count, rerun turnaround