AMS Interface · All levels
Mixed-Signal Physical Verification: Reports & Metrics
Reports & Metrics for Mixed-Signal Physical Verification.
Reports and metrics
Reports & Metrics for Mixed-Signal Physical Verification focuses on AMS PV closure rate, signoff waiver count, rerun turnaround. The goal is to connect observed symptom to boundary mechanism, ownership, and signoff risk.
Reports convert AMS PV closure rate, signoff waiver count, rerun turnaround into release decisions. A single average metric is insufficient; use tails, mode breakdowns, and trend under controlled conditions.
Metric movement
METRIC GRAPH — AMS PV closure rate, signoff waiver count, rerun turnaround
health / margin
^
| target
| - - - - - - -
| o post-fix
| o
| o baseline
| o failing run
+--------------------------------------> debug iteration
repro setup root-cause proof release candidate
Readout:
- compare only equivalent mode, payload, clock, and environment tags
- separate symptom stabilization from true mechanism closureDistribution view
METRIC DISTRIBUTION — Mixed-Signal Physical Verification
occurrence
| ***
| *******
| ***********
|************* <- left tail (worst boundary excursions)
+--------------------> margin / stability / error metric
bad nominal
Fix the tail first; average value can hide integration escapes.Track AMS PV closure rate, signoff waiver count, rerun turnaround by mode and stress condition.
Report p95/p99 or worst-case tail when intermittent escapes matter.
Store metric with exact artifact and configuration tags.
Separate symptom stabilization from mechanism closure.
AMS deep dive
Physical proximity and boundary rules are functional constraints in AMS SoCs.
Concept diagram
INTEGRATION FLOW
floorplan keepouts -> guard strategy -> abutment policy -> PV signoffMetric graph
INTEGRATION ESCAPES
layout boundary issues ███████
waiver drift ████Reports and artifacts
keepout violations
guard-ring checks
abutment DRC
mixed-signal PV dashboard
Mini case study
Late macro move violated quiet-zone assumptions and caused intermittent converter noise excursions.
Debug branches
Review macro adjacency
Re-check guard assumptions
Re-run PV with correct deck variant
Senior review question
Ask: what boundary condition proves this topic is actually closed?
Key takeaways
State boundary, mode, and evidence tag with every claim.
Always align analog, digital, and physical owners before signoff decisions.
Common pitfalls
Fixing averages while tails still fail.
Skipping package/supply evidence in jitter or SerDes issues.
Shipping with waivers that lack owner and expiration criteria.