AMS Interface · All levels

Mixed-Signal Physical Verification: Reports & Metrics

Reports & Metrics for Mixed-Signal Physical Verification.

Reports and metrics

Reports & Metrics for Mixed-Signal Physical Verification focuses on AMS PV closure rate, signoff waiver count, rerun turnaround. The goal is to connect observed symptom to boundary mechanism, ownership, and signoff risk.

Reports convert AMS PV closure rate, signoff waiver count, rerun turnaround into release decisions. A single average metric is insufficient; use tails, mode breakdowns, and trend under controlled conditions.

Metric movement

diagram
METRIC GRAPH — AMS PV closure rate, signoff waiver count, rerun turnaround

health / margin
  ^
  |                         target
  |                       - - - - - - -
  |                  o post-fix
  |              o
  |         o baseline
  |    o failing run
  +--------------------------------------> debug iteration
    repro setup    root-cause proof    release candidate

Readout:
  - compare only equivalent mode, payload, clock, and environment tags
  - separate symptom stabilization from true mechanism closure

Distribution view

diagram
METRIC DISTRIBUTION — Mixed-Signal Physical Verification

occurrence
  |      ***
  |    *******
  |  ***********
  |*************  <- left tail (worst boundary excursions)
  +--------------------> margin / stability / error metric
  bad                 nominal

Fix the tail first; average value can hide integration escapes.
  • Track AMS PV closure rate, signoff waiver count, rerun turnaround by mode and stress condition.

  • Report p95/p99 or worst-case tail when intermittent escapes matter.

  • Store metric with exact artifact and configuration tags.

  • Separate symptom stabilization from mechanism closure.

AMS deep dive

Physical proximity and boundary rules are functional constraints in AMS SoCs.

Concept diagram

diagram
INTEGRATION FLOW

floorplan keepouts -> guard strategy -> abutment policy -> PV signoff

Metric graph

diagram
INTEGRATION ESCAPES

layout boundary issues ███████
waiver drift           ████

Reports and artifacts

  • keepout violations

  • guard-ring checks

  • abutment DRC

  • mixed-signal PV dashboard

Mini case study

Late macro move violated quiet-zone assumptions and caused intermittent converter noise excursions.

Debug branches

  • Review macro adjacency

  • Re-check guard assumptions

  • Re-run PV with correct deck variant

Senior review question

Ask: what boundary condition proves this topic is actually closed?

Key takeaways

  • State boundary, mode, and evidence tag with every claim.

  • Always align analog, digital, and physical owners before signoff decisions.

Common pitfalls

  • Fixing averages while tails still fail.

  • Skipping package/supply evidence in jitter or SerDes issues.

  • Shipping with waivers that lack owner and expiration criteria.

Reading reports