Inputs & Outputs for Mixed-Signal Physical Verification focuses on AMS PV closure rate, signoff waiver count, rerun turnaround. The goal is to connect observed symptom to boundary mechanism, ownership, and signoff risk.
Treat these inputs and outputs as signed interface guarantees. Ambiguity here creates the most expensive integration bugs.
INPUTS
- AMS handoff contract and spec revision
- mode definitions (power/clock/reset/traffic)
- wrapper and boundary-cell assumptions
- physical constraints: keepouts, guard, package limits
OUTPUTS
- mode-tagged metric report
- owner-signed debug or closure note
- waiver manifest with expiry and controls
- release recommendationAMS BOUNDARY SEQUENCE — Mixed-Signal Physical Verification
analog macro -> wrapper / boundary cell -> synchronizer or sampler -> digital consumer
| | | |
analog assumptions legal voltage/state clock/reset contract protocol/data validity
metric under watch: AMS PV closure rate, signoff waiver count, rerun turnaroundOWNERSHIP MAP — Mixed-Signal Physical Verification
artifact owner
---------------------- -----------------------------
integration artifact PV lead
implementation artifact analog layout owner
signoff artifact program signoff owner
Every boundary issue needs a named owner before fixes start.Physical proximity and boundary rules are functional constraints in AMS SoCs.
INTEGRATION FLOW
floorplan keepouts -> guard strategy -> abutment policy -> PV signoffINTEGRATION ESCAPES
layout boundary issues ███████
waiver drift ████keepout violations
guard-ring checks
abutment DRC
mixed-signal PV dashboard
Late macro move violated quiet-zone assumptions and caused intermittent converter noise excursions.
Review macro adjacency
Re-check guard assumptions
Re-run PV with correct deck variant
Ask: what boundary condition proves this topic is actually closed?
State boundary, mode, and evidence tag with every claim.
Always align analog, digital, and physical owners before signoff decisions.
Fixing averages while tails still fail.
Skipping package/supply evidence in jitter or SerDes issues.
Shipping with waivers that lack owner and expiration criteria.
Mixed-signal PV combines digital and analog rule decks, LVS partition assumptions, and waiver discipline to achieve manufacturable signoff.
Metric: AMS PV closure rate, signoff waiver count, rerun turnaround
This content block can't be displayed here.
Block type: unknown
This content block can't be displayed here.
Block type: unknown
This content block can't be displayed here.
Block type: unknown