Bad budget hygiene becomes expensive ECO churn near tapeout.
Guardband margins
late ECO spillover
Emergency frequency guards
clocking overhead
Cross-domain path regressions
late closure churn
Route congestion from top-level fixes
package-driven detours
Re-validation of waived assumptions
PPA RISK — Integration Milestones
area/power/timing confidence vs integration velocityIntegration discipline reduces expensive late-stage silicon risk.
BEFORE / AFTER FIX — Integration Milestones
risk index
0 | --- target
40 | ● regression
65 | ● before fix
20 | ● after fix
+-------------------------------> iteration
Always verify collateral, regression suite, and owner signoff.Budget and ownership contracts are technical artifacts, not PM slides.
HIERARCHY CONTRACT FLOW
partition -> block budget -> owner signoff -> integration checkpointBUDGET RISK TREND
open risks ████████
owned fixes ███████
unowned risks ██budget delta dashboard
ownership matrix
milestone health report
risk register
A timing overrun was solved only after budget ownership moved from shared to single-threaded.
Validate contract revision
Check owner signatures
Audit milestone readiness
Ask: what baseline, owner, and artifact prove this topic is truly closed?
State baseline manifest and owner with every closure metric.
Run cross-domain regression after every top-level fix.
Comparing results across different manifests.
Unowned issues slipping through review cycles.
Waiving risks without expiry and validation plan.
Milestones align RTL freeze, collateral handoff, floorplan lock, and signoff criteria so teams converge instead of iterating blindly.
Metric: milestone slip rate, integration blocker burn-down