Use when you own Integration Milestones in a top-level integration review.
Open latest integration baseline and manifest.
Inspect failing metric by domain.
Trace first failing contract boundary.
Collect artifacts and assign single-thread owner.
Define minimal proof experiment.
Apply smallest reversible fix.
Run focused check then full regression.
Update dashboard and governance log.
Decide: close, waive with expiry, or escalate.
Publish final review memo.
milestone checklist, readiness board, blocker tracker
baseline manifest
owner matrix
regression summary
risk memo
SOC DECISION MEMO — Integration Milestones
baseline:
metric:
root cause:
fix:
residual risk:
owners: program manager, integration lead, PD leadINTEGRATION MILESTONES
M0 contract freeze
M1 IP handoff complete
M2 subsystem bring-up
M3 top-level smoke pass
M4 signoff reviewBudget and ownership contracts are technical artifacts, not PM slides.
HIERARCHY CONTRACT FLOW
partition -> block budget -> owner signoff -> integration checkpointBUDGET RISK TREND
open risks ████████
owned fixes ███████
unowned risks ██budget delta dashboard
ownership matrix
milestone health report
risk register
A timing overrun was solved only after budget ownership moved from shared to single-threaded.
Validate contract revision
Check owner signatures
Audit milestone readiness
Ask: what baseline, owner, and artifact prove this topic is truly closed?
State baseline manifest and owner with every closure metric.
Run cross-domain regression after every top-level fix.
Comparing results across different manifests.
Unowned issues slipping through review cycles.
Waiving risks without expiry and validation plan.
Milestones align RTL freeze, collateral handoff, floorplan lock, and signoff criteria so teams converge instead of iterating blindly.
Metric: milestone slip rate, integration blocker burn-down