Debug Playbook for Package Bring-up & Failures focuses on package-related bring-up escape count. The goal is to map symptoms to boundary contracts, owner actions, and regression-proof closure.
Integration debug is a search for the first contract break, not the loudest downstream failure signature.
ROOT-CAUSE TREE — Package Bring-up & Failures
package-related bring-up escape count regressed
|
same baseline manifest?
/ \
no yes
| |
version/collateral real integration
mismatch contract break
/ \ |
inputs env isolate domain
drift drift and first failureFreeze baseline manifest and owner matrix.
Find first failing boundary and earliest reproducible symptom.
Classify failure type: contract, collateral, implementation, or governance.
Prove with one reduced experiment.
Apply smallest owner-controlled fix.
Run focused verification and full cross-domain regression.
STAFF SOC REVIEW MEMO — Package & Interface / Package Bring-up & Failures
1. Symptom
- Watched metric: package-related bring-up escape count
- Failing integration boundary: <domain/interface>
- Baseline manifest: <hash/tag>
- Repro setup: <sim/emulation/fpga/silicon + fw tag>
2. Mechanism hypothesis
- Primary mechanism: Late package failures often stem from model mismatch, power-delivery assumptions, or lane/mapping swaps that escaped pre-silicon checks.
- Competing hypothesis: <contract drift, collateral mismatch, implementation bug, governance gap>
- Missing evidence: <trace, report, checklist, signoff artifact>
3. Proposed action
- Minimal reversible fix: <contract update, config patch, RTL fix, process guardrail>
- Expected metric movement: <delta and scope>
- Regression risk: timing, power, functionality, schedule
4. Signoff
- Re-run artifact: failure signature catalog, package debug checklist, correlation report
- Required owners: bring-up lead, package owner, SI/PI owner
- Final decision: close, waive (bounded), or escalatePackage assumptions must be treated as first-class chip constraints.
PACKAGE CO-DESIGN
die io <-> package routing <-> board constraintsPACKAGE RISK MIX
SI margin █████
power integrity ████
lane mapping ███bump map revision log
SI/PI margin report
IO co-design checklist
package bring-up failures
Link degradation on product board came from package routing assumptions not reflected in pre-silicon model.
Compare package model versions
Audit lane mapping
Correlate SI/PI margins to failures
Ask: what baseline, owner, and artifact prove this topic is truly closed?
State baseline manifest and owner with every closure metric.
Run cross-domain regression after every top-level fix.
Comparing results across different manifests.
Unowned issues slipping through review cycles.
Waiving risks without expiry and validation plan.
Late package failures often stem from model mismatch, power-delivery assumptions, or lane/mapping swaps that escaped pre-silicon checks.
Metric: package-related bring-up escape count
This content block can't be displayed here.
Block type: unknown
This content block can't be displayed here.
Block type: unknown
This content block can't be displayed here.
Block type: unknown