SoC Integration · All levels
Chip-Package I/O Co-design: Reports & Metrics
Reports & Metrics for Chip-Package I/O Co-design.
Reports and metrics
Reports & Metrics for Chip-Package I/O Co-design focuses on I/O timing closure against package constraints. The goal is to map symptoms to boundary contracts, owner actions, and regression-proof closure.
The job of a report is to convert I/O timing closure against package constraints into a closure decision. One summary number is never enough without baseline, owner, and boundary context.
Metric movement
METRIC GRAPH — I/O timing closure against package constraints
integration confidence
^
| target
| - - - - - - -
| o post-fix + regression
| o
| o baseline
| o failing run
+--------------------------------------> closure iteration
baseline freeze owner fix full matrix
Readout:
- compare results on the same manifest baseline
- state owner and boundary with every metric movementRisk distribution
RISK HISTOGRAM — Chip-Package I/O Co-design
issue count
| ***
| *******
| ***********
|************* <- critical tail
+--------------------> risk severity
low medium high
Debug the high-severity tail first; averages hide escape risk.Track I/O timing closure against package constraints by domain and owner boundary.
Store baseline manifest beside every metric snapshot.
Report both immediate fix result and full regression result.
Explicitly call out residual risk and ownership.
SoC deep dive
Package assumptions must be treated as first-class chip constraints.
Concept diagram
PACKAGE CO-DESIGN
die io <-> package routing <-> board constraintsMetric graph
PACKAGE RISK MIX
SI margin █████
power integrity ████
lane mapping ███Reports and artifacts
bump map revision log
SI/PI margin report
IO co-design checklist
package bring-up failures
Mini case study
Link degradation on product board came from package routing assumptions not reflected in pre-silicon model.
Debug branches
Compare package model versions
Audit lane mapping
Correlate SI/PI margins to failures
Senior review question
Ask: what baseline, owner, and artifact prove this topic is truly closed?
Key takeaways
State baseline manifest and owner with every closure metric.
Run cross-domain regression after every top-level fix.
Common pitfalls
Comparing results across different manifests.
Unowned issues slipping through review cycles.
Waiving risks without expiry and validation plan.