AMS Interface · All levels
Equalization Overview: Step-by-Step Walkthrough
Step-by-Step Walkthrough for Equalization Overview.
Step-by-step analysis walkthrough
Use this when you own Equalization Overview during an AMS war room.
Capture failing mode and environmental condition.
Pull synchronized waveform, logs, and report artifacts.
Mark first boundary where legal behavior diverges.
Audit reset/clock/power sequence assumptions.
Check physical coupling contributors (floorplan/power/package) where relevant.
Assign single-thread ownership for the first fix.
Propose bounded change and define success criterion.
Run scenario and safety regressions.
Document findings in closure memo.
Update signoff dashboard and waiver state.
Artifacts to collect
EQ sweep report, eye diagram snapshot, adaptation log
handoff contract
firmware/config tag
physical signoff snapshot
decision memo
Decision memo template
AMS DECISION MEMO — Equalization Overview
mode/condition:
metric:
hypothesis:
fix:
regression:
owners: SI owner, SerDes owner, validation engineerReference visuals
Equalization tradeoff
EQ too low -> ISI dominates -> BER rises
EQ optimal -> eye opens -> BER minimum
EQ too high -> noise amplified -> BER risesAMS deep dive
SerDes closure requires protocol, training, and SI evidence together.
Concept diagram
SERDES FLOW
training -> equalization -> lane margin -> protocol stabilityMetric graph
BER VS EQ
BER
^
| high low high
+-----------------> EQ settingReports and artifacts
lane BER
training state transitions
EQ sweep report
link retry counters
Mini case study
Link looked protocol-clean but lane margin collapsed under thermal sweep.
Debug branches
Correlate LTSSM and lane metrics
Check SI margins
Review firmware timeout assumptions
Senior review question
Ask: what boundary condition proves this topic is actually closed?
Key takeaways
State boundary, mode, and evidence tag with every claim.
Always align analog, digital, and physical owners before signoff decisions.
Common pitfalls
Fixing averages while tails still fail.
Skipping package/supply evidence in jitter or SerDes issues.
Shipping with waivers that lack owner and expiration criteria.
Principal AMS review addendum
TX pre-emphasis and RX equalization compensate ISI and channel loss; over/under-equalization shifts noise sensitivity and error distribution.
Metric: eye opening, BER vs EQ setting, adaptation convergence