Synthesis & Logic Optimization · All levels
VT Mix Strategy: Step-by-Step Walkthrough
Step-by-Step Walkthrough for VT Mix Strategy.
Step-by-step analysis walkthrough
Use when you own VT Mix Strategy in a synthesis closure review.
Confirm exact run context (RTL/SDC/lib/switch set).
Open section QoR dashboard and identify first drift.
Inspect topic-level report for mechanism evidence.
Determine owner and candidate reversible action.
Apply one change only; avoid bundled fixes.
Run full timing/area/power checks.
Validate side effects on neighboring path groups.
Publish memo with outcome and residual risk.
Artifacts to collect
VT distribution report, leakage breakdown, timing split report
QoR dashboard
run manifest
constraint diff
regression matrix
Decision memo template
SYNTHESIS DECISION MEMO — VT Mix Strategy
run context:
observed metric:
hypothesis:
fix:
regression:
owners: synthesis owner, power owner, STA ownerReference visuals
VT mix triangle
LVT: speed ++ leakage --
SVT: balance
HVT: speed -- leakage ++
mix per criticality bucketSynthesis deep dive
PPA closure is a constrained tradeoff problem, not a timing-only exercise.
Concept diagram
PPA TRIAD
timing target <-> power budget <-> area capMetric graph
PARETO PROGRESSION
early runs o o
balanced point o
over-tuned o (risk)Reports and artifacts
VT mix
leakage trend
dynamic power trend
PPA Pareto table
Mini case study
LVT-heavy fix recovered setup but violated leakage target; balanced VT strategy closed both.
Debug branches
Timing-only claims need power check
Validate hold on VT swaps
Use Pareto memo
Senior review question
Ask: what evidence proves this QoR move is real and stable?
Key takeaways
State exact run context (RTL, SDC, libs, switches) with every QoR claim.
Re-run timing, area, and power regressions after each synthesis ECO.
Common pitfalls
Comparing runs with mismatched constraints or library views.
Timing-only fixes that violate power or area budgets.
Skipping equivalence checks after structural changes.
Principal synthesis review addendum
VT assignment trades delay against leakage; poor mix causes either timing misses or unnecessary static power burn.
Metric: HVT/SVT/LVT cell mix, setup/hold slack distribution, leakage budget