Synthesis & Logic Optimization · All levels
Clock-Gating Inference: Inputs & Outputs
Inputs & Outputs for Clock-Gating Inference.
Inputs and outputs contract
Inputs & Outputs for Clock-Gating Inference focuses on clock-gating insertion rate, gating check violations, clock power delta. The goal is to connect observed QoR movement to mechanism, ownership, and regression risk.
Synthesis closure fails when teams optimize against different assumptions. Treat these artifacts as a signed handoff contract.
INPUTS
- RTL tag and compile switches
- SDC / policy constraints
- Library and operating views
- Optional physical estimates (topo/congestion)
OUTPUTS
- QoR timing/area/power reports
- transform/mapping summaries
- owner-tagged closure memo
- regression matrix verdictFlow sequence
SYNTHESIS FLOW — Clock-Gating Inference
RTL + constraints
|
v
elaboration + checks
|
v
mapping + optimization
|
v
QoR reports (timing/area/power)
|
v
incremental ECO + regression
Primary metric: clock-gating insertion rate, gating check violations, clock power deltaOwnership map
OWNERSHIP MAP — Clock-Gating Inference
artifact owner
---------------- -----------------
compile owner synthesis owner
timing/power owner power owner
cross-team review verification owner
Every QoR movement needs a named owner before ECO.Synthesis deep dive
Constraint hygiene determines whether synthesis QoR is trustworthy.
Concept diagram
CONSTRAINT FLOW
RTL intent -> synthesis SDC -> compile checks -> QoR dashboard -> review gateMetric graph
QOR HEALTH
constraint lint pass ███████████████
unconstrained count ███
policy violations ██Reports and artifacts
compile QoR
unconstrained endpoints
constraint lint
policy audit log
Mini case study
Nightly WNS improved but unconstrained paths jumped; strict SDC lint restored true QoR picture.
Debug branches
Diff SDC first
Audit dont_touch scope
Track unconstrained trend weekly
Senior review question
Ask: what evidence proves this QoR move is real and stable?
Key takeaways
State exact run context (RTL, SDC, libs, switches) with every QoR claim.
Re-run timing, area, and power regressions after each synthesis ECO.
Common pitfalls
Comparing runs with mismatched constraints or library views.
Timing-only fixes that violate power or area budgets.
Skipping equivalence checks after structural changes.
Principal synthesis review addendum
Inference quality depends on RTL style and constraints; wrong enable semantics or exclusion policy causes either missed savings or unsafe gating.
Metric: clock-gating insertion rate, gating check violations, clock power delta