Synthesis & Logic Optimization · All levels
Dont-Touch & Preserve Policy
Constraints & QoR: dont_touch and preserve are surgical controls; overuse blocks optimization and underuse breaks intended structures such as CDC wrappers or DFT hooks.
What this topic teaches
Dont-Touch & Preserve Policy teaches how to turn synthesis intent into stable QoR outcomes. dont_touch and preserve are surgical controls; overuse blocks optimization and underuse breaks intended structures such as CDC wrappers or DFT hooks. Senior practice is proving whether metric movement is real, reproducible, and owned.
The senior-engineer question
When preserved object count, blocked optimization opportunities, ECO rework moves, can you name the run context, mechanism, owner, and minimal fix that holds under regression?
SYNTHESIS FLOW — Dont-Touch & Preserve Policy
RTL + constraints
|
v
elaboration + checks
|
v
mapping + optimization
|
v
QoR reports (timing/area/power)
|
v
incremental ECO + regression
Primary metric: preserved object count, blocked optimization opportunities, ECO reworkPicture the synthesis flow
Draw the behavior before diving into tool commands. These diagrams are the whiteboard models to memorize for reviews and interviews.
Preserve policy decision tree
OBJECT MARKED preserve/dont_touch?
|
functional or signoff reason?
/ \
yes no
| |
keep + audit remove, re-compileQoR trend shape
QOR TREND — Dont-Touch & Preserve Policy
metric quality
^
| target band
| o o o
| o
| o regression
+----------------------------------> synthesis iteration
baseline tuning signoff-ready
Track: preserved object count, blocked optimization opportunities, ECO reworkWho owns which layer
SYNTHESIS OWNERSHIP LAYERS — Dont-Touch & Preserve Policy
layer owns failure mode
---------------- --------------------------- -------------------------
constraints clocks/exceptions/policy fake QoR optimism
mapping cell choices/structure depth/fanout regressions
optimization timing/power tradeoffs one-metric overfitting
physical-aware topo/congestion estimates handoff delta surprises
closure ECO order/regression fixes break other cornersEvidence to collect
Primary metric: preserved object count, blocked optimization opportunities, ECO rework.
Primary artifact: constraint audit, preserve list, optimization-block report.
Owners to involve: synthesis lead, RTL owner, DFT owner.
One baseline run and one regressed run with matching manifests.
A rollback-safe change proposal with full regression scope.
Ownership map
OWNERSHIP MAP — Dont-Touch & Preserve Policy
artifact owner
---------------- -----------------
compile owner synthesis lead
timing/power owner RTL owner
cross-team review DFT owner
Every QoR movement needs a named owner before ECO.Subpages in this topic
Each topic is taught through mechanism, interfaces, reports, debug, worked example, pitfalls, interview, checklist, theory, design space, expanded case study, walkthrough, comparison matrix, software view, and silicon PPA impact.
Key takeaways
Always present QoR with run context and artifact.
Prefer reversible fixes with explicit rollback criteria.
Re-run timing, area, and power checks before closing.
Common pitfalls
Comparing unlike compile contexts.
Timing-only wins that worsen power or area.
Skipping equivalence checks after structural changes.
Synthesis deep dive
Constraint hygiene determines whether synthesis QoR is trustworthy.
Concept diagram
CONSTRAINT FLOW
RTL intent -> synthesis SDC -> compile checks -> QoR dashboard -> review gateMetric graph
QOR HEALTH
constraint lint pass ███████████████
unconstrained count ███
policy violations ██Reports and artifacts
compile QoR
unconstrained endpoints
constraint lint
policy audit log
Mini case study
Nightly WNS improved but unconstrained paths jumped; strict SDC lint restored true QoR picture.
Debug branches
Diff SDC first
Audit dont_touch scope
Track unconstrained trend weekly
Senior review question
Ask: what evidence proves this QoR move is real and stable?
Key takeaways
State exact run context (RTL, SDC, libs, switches) with every QoR claim.
Re-run timing, area, and power regressions after each synthesis ECO.
Common pitfalls
Comparing runs with mismatched constraints or library views.
Timing-only fixes that violate power or area budgets.
Skipping equivalence checks after structural changes.