Synthesis & Logic Optimization · All levels
Synthesis SDC Contracts: Expanded Case Study
Expanded Case Study for Synthesis SDC Contracts.
Extended case study
Closure review: compile WNS/TNS, unconstrained endpoint count, SDC lint error rate regressed after a change touching Synthesis SDC Contracts.
Background
Team previously had stable baseline across weekly compile runs and agreed guardbands.
Symptoms observed
compile WNS/TNS, unconstrained endpoint count, SDC lint error rate moved beyond threshold
Mismatch between local and CI runs
Owner disagreement on first fix
Investigation timeline
Hour 0: freeze manifests and compare run metadata
Hour 1: isolate section/topic-specific failure pattern
Hour 2: verify constraints and library view consistency
Hour 3: inspect transform and mapping deltas
Hour 4: choose one reversible fix
Hour 5: execute full regression matrix
Hour 6: publish closure memo and next actions
Root cause
Unconstrained generated-clock branch masked timing debt until strict SDC lint gate was restored.
Fix and validation
Targeted synthesis tweak with audit trail
Re-run compile report, SDC lint log, unconstrained path report
Update dashboard and handoff notes
Lessons learned
Compare like-for-like runs only
Assign clear owner before ECO
Keep rollback ready
CASE STUDY — Synthesis SDC Contracts
baseline / regression / recovery QoR snapshotSequence under stress
SYNTHESIS FLOW — Synthesis SDC Contracts
RTL + constraints
|
v
elaboration + checks
|
v
mapping + optimization
|
v
QoR reports (timing/area/power)
|
v
incremental ECO + regression
Primary metric: compile WNS/TNS, unconstrained endpoint count, SDC lint error rateSynthesis deep dive
Constraint hygiene determines whether synthesis QoR is trustworthy.
Concept diagram
CONSTRAINT FLOW
RTL intent -> synthesis SDC -> compile checks -> QoR dashboard -> review gateMetric graph
QOR HEALTH
constraint lint pass ███████████████
unconstrained count ███
policy violations ██Reports and artifacts
compile QoR
unconstrained endpoints
constraint lint
policy audit log
Mini case study
Nightly WNS improved but unconstrained paths jumped; strict SDC lint restored true QoR picture.
Debug branches
Diff SDC first
Audit dont_touch scope
Track unconstrained trend weekly
Senior review question
Ask: what evidence proves this QoR move is real and stable?
Key takeaways
State exact run context (RTL, SDC, libs, switches) with every QoR claim.
Re-run timing, area, and power regressions after each synthesis ECO.
Common pitfalls
Comparing runs with mismatched constraints or library views.
Timing-only fixes that violate power or area budgets.
Skipping equivalence checks after structural changes.
Principal synthesis review addendum
Synthesis SDC defines clocks, IO assumptions, and optimization boundaries; weak constraints produce fake QoR wins and expensive downstream churn.
Metric: compile WNS/TNS, unconstrained endpoint count, SDC lint error rate