Synthesis & Logic Optimization · All levels
Synthesis SDC Contracts: Design Space
Design Space for Synthesis SDC Contracts.
Design space exploration
For Synthesis SDC Contracts, options trade QoR gain, risk, and schedule.
Option A — conservative
Conservative constraints: helps predictability
Risk: slower PPA gains
Validate with: first-silicon safety
Option B — balanced
Balanced QoR tuning: helps stable closure
Risk: requires discipline
Validate with: typical product mode
Option C — aggressive compile
Aggressive compile push: helps fast timing recovery
Risk: power/hold regressions
Validate with: late schedule
Option D — structural change
Structural RTL change: helps long-term fix
Risk: schedule impact
Validate with: recurring bottleneck
DESIGN SPACE — Synthesis SDC Contracts
QoR gain <-> regression risk <-> schedule pressureDesign pitfalls
Single-metric optimization
No rollback path
Weak run comparability
Tradeoff curve
BEFORE / AFTER QOR — Synthesis SDC Contracts
QoR score
0 | --- target zone
-1 | ● regression
-2 | ● baseline
-0.5| ● after fix
+----------------------------------> iteration
Validate timing + area + power, not one number.Synthesis deep dive
Constraint hygiene determines whether synthesis QoR is trustworthy.
Concept diagram
CONSTRAINT FLOW
RTL intent -> synthesis SDC -> compile checks -> QoR dashboard -> review gateMetric graph
QOR HEALTH
constraint lint pass ███████████████
unconstrained count ███
policy violations ██Reports and artifacts
compile QoR
unconstrained endpoints
constraint lint
policy audit log
Mini case study
Nightly WNS improved but unconstrained paths jumped; strict SDC lint restored true QoR picture.
Debug branches
Diff SDC first
Audit dont_touch scope
Track unconstrained trend weekly
Senior review question
Ask: what evidence proves this QoR move is real and stable?
Key takeaways
State exact run context (RTL, SDC, libs, switches) with every QoR claim.
Re-run timing, area, and power regressions after each synthesis ECO.
Common pitfalls
Comparing runs with mismatched constraints or library views.
Timing-only fixes that violate power or area budgets.
Skipping equivalence checks after structural changes.
Principal synthesis review addendum
Synthesis SDC defines clocks, IO assumptions, and optimization boundaries; weak constraints produce fake QoR wins and expensive downstream churn.
Metric: compile WNS/TNS, unconstrained endpoint count, SDC lint error rate