Synthesis & Logic Optimization · All levels
ECO Regression Discipline: Inputs & Outputs
Inputs & Outputs for ECO Regression Discipline.
Inputs and outputs contract
Inputs & Outputs for ECO Regression Discipline focuses on post-ECO regressions caught, corner coverage, signoff approval latency. The goal is to connect observed QoR movement to mechanism, ownership, and regression risk.
Synthesis closure fails when teams optimize against different assumptions. Treat these artifacts as a signed handoff contract.
INPUTS
- RTL tag and compile switches
- SDC / policy constraints
- Library and operating views
- Optional physical estimates (topo/congestion)
OUTPUTS
- QoR timing/area/power reports
- transform/mapping summaries
- owner-tagged closure memo
- regression matrix verdictFlow sequence
SYNTHESIS FLOW — ECO Regression Discipline
RTL + constraints
|
v
elaboration + checks
|
v
mapping + optimization
|
v
QoR reports (timing/area/power)
|
v
incremental ECO + regression
Primary metric: post-ECO regressions caught, corner coverage, signoff approval latencyOwnership map
OWNERSHIP MAP — ECO Regression Discipline
artifact owner
---------------- -----------------
compile owner timing closure lead
timing/power owner verification owner
cross-team review program owner
Every QoR movement needs a named owner before ECO.Synthesis deep dive
Incremental and ECO synthesis protect schedule only with strict regression discipline.
Concept diagram
INCREMENTAL ECO LOOP
identify delta -> localized compile -> patch -> regression -> releaseMetric graph
ECO CYCLE TIME
full compile ███████████
incremental █████Reports and artifacts
incremental reuse
ECO patch list
LEC status
regression matrix
Mini case study
Localized compile cut turnaround 40%, but skipped LEC caused rollback.
Debug branches
Reuse ratio is not enough
Patch locality check
Always include equivalence hooks
Senior review question
Ask: what evidence proves this QoR move is real and stable?
Key takeaways
State exact run context (RTL, SDC, libs, switches) with every QoR claim.
Re-run timing, area, and power regressions after each synthesis ECO.
Common pitfalls
Comparing runs with mismatched constraints or library views.
Timing-only fixes that violate power or area budgets.
Skipping equivalence checks after structural changes.
Principal synthesis review addendum
Regression discipline prevents late-stage surprises by enforcing setup/hold, power, and equivalence checks after every ECO wave.
Metric: post-ECO regressions caught, corner coverage, signoff approval latency