Debug playbook
Debug Playbook for Equivalence Hooks focuses on LEC pass rate, unresolved points, debug turnaround. The goal is to connect observed QoR movement to mechanism, ownership, and regression risk.
Synthesis debug finds the first causal drift, not the loudest downstream symptom.
Root-cause tree
ROOT-CAUSE TREE — Equivalence Hooks
LEC pass rate, unresolved points, debug turnaround regressed
|
same RTL/constraints tag?
/ \
no yes
| |
input drift transform side-effect
/ \ / \
SDC libs mapping physical estimate
diff diff choice mismatchFreeze baseline and regressed run manifests.
Verify RTL/SDC/library deltas before transform tuning.
Classify issue: constraints, mapping choice, physical estimate, or ECO side effect.
Pick one minimal reversible change.
Re-run full timing/area/power checks with ownership signoff.
Review memo template
STAFF SYNTHESIS REVIEW MEMO — Incremental & ECO Synthesis / Equivalence Hooks
1. Symptom
- Watched metric: LEC pass rate, unresolved points, debug turnaround
- Affected compile run: <tag/build ID>
- Impacted path/class: <critical group / power lane / area lane>
- Database tags: <RTL, SDC, libs, switches>
2. Mechanism hypothesis
- Primary mechanism: Equivalence hooks align synthesis and ECO transformations with formal checking so aggressive optimization remains provably correct.
- Competing hypothesis: <constraint drift, mapping choice, physical estimate mismatch>
- Missing evidence: <report diff, dashboard trend, ownership board>
3. Proposed action
- Minimal reversible change: <constraint patch, compile knob, ECO cell move>
- Expected movement: <timing / area / power delta>
- Regression risk: hold, power spike, leakage drift, formal mismatch
4. Signoff
- Re-run artifact: LEC script, mismatch report, waivers log
- Required owners: formal owner, synthesis owner, CAD owner
- Final decision: merge, rollback, or escalateSynthesis deep dive
Incremental and ECO synthesis protect schedule only with strict regression discipline.
Concept diagram
INCREMENTAL ECO LOOP
identify delta -> localized compile -> patch -> regression -> releaseMetric graph
ECO CYCLE TIME
full compile ███████████
incremental █████Reports and artifacts
incremental reuse
ECO patch list
LEC status
regression matrix
Mini case study
Localized compile cut turnaround 40%, but skipped LEC caused rollback.
Debug branches
Reuse ratio is not enough
Patch locality check
Always include equivalence hooks
Senior review question
Ask: what evidence proves this QoR move is real and stable?
Key takeaways
State exact run context (RTL, SDC, libs, switches) with every QoR claim.
Re-run timing, area, and power regressions after each synthesis ECO.
Common pitfalls
Comparing runs with mismatched constraints or library views.
Timing-only fixes that violate power or area budgets.
Skipping equivalence checks after structural changes.
Principal synthesis review addendum
Equivalence hooks align synthesis and ECO transformations with formal checking so aggressive optimization remains provably correct.
Metric: LEC pass rate, unresolved points, debug turnaround