Synthesis & Logic Optimization · All levels
PD Handoff Reports
Physical-Aware Synthesis: Strong handoff packages constraints, scenario assumptions, and QoR baselines so PD can preserve intent and diagnose deltas quickly.
What this topic teaches
PD Handoff Reports teaches how to turn synthesis intent into stable QoR outcomes. Strong handoff packages constraints, scenario assumptions, and QoR baselines so PD can preserve intent and diagnose deltas quickly. Senior practice is proving whether metric movement is real, reproducible, and owned.
The senior-engineer question
When handoff completeness, view consistency, first-route QoR deviation moves, can you name the run context, mechanism, owner, and minimal fix that holds under regression?
SYNTHESIS FLOW — PD Handoff Reports
RTL + constraints
|
v
elaboration + checks
|
v
mapping + optimization
|
v
QoR reports (timing/area/power)
|
v
incremental ECO + regression
Primary metric: handoff completeness, view consistency, first-route QoR deviationPicture the synthesis flow
Draw the behavior before diving into tool commands. These diagrams are the whiteboard models to memorize for reviews and interviews.
PD handoff package
netlist + SDC + scenario map
QoR baseline + assumptions
owner matrix + known risksQoR trend shape
QOR TREND — PD Handoff Reports
metric quality
^
| target band
| o o o
| o
| o regression
+----------------------------------> synthesis iteration
baseline tuning signoff-ready
Track: handoff completeness, view consistency, first-route QoR deviationWho owns which layer
SYNTHESIS OWNERSHIP LAYERS — PD Handoff Reports
layer owns failure mode
---------------- --------------------------- -------------------------
constraints clocks/exceptions/policy fake QoR optimism
mapping cell choices/structure depth/fanout regressions
optimization timing/power tradeoffs one-metric overfitting
physical-aware topo/congestion estimates handoff delta surprises
closure ECO order/regression fixes break other cornersEvidence to collect
Primary metric: handoff completeness, view consistency, first-route QoR deviation.
Primary artifact: handoff manifest, baseline QoR snapshot, assumption checklist.
Owners to involve: synthesis lead, PD lead, CAD owner.
One baseline run and one regressed run with matching manifests.
A rollback-safe change proposal with full regression scope.
Ownership map
OWNERSHIP MAP — PD Handoff Reports
artifact owner
---------------- -----------------
compile owner synthesis lead
timing/power owner PD lead
cross-team review CAD owner
Every QoR movement needs a named owner before ECO.Subpages in this topic
Each topic is taught through mechanism, interfaces, reports, debug, worked example, pitfalls, interview, checklist, theory, design space, expanded case study, walkthrough, comparison matrix, software view, and silicon PPA impact.
Key takeaways
Always present QoR with run context and artifact.
Prefer reversible fixes with explicit rollback criteria.
Re-run timing, area, and power checks before closing.
Common pitfalls
Comparing unlike compile contexts.
Timing-only wins that worsen power or area.
Skipping equivalence checks after structural changes.
Synthesis deep dive
Physical-aware synthesis reduces logic-to-route surprise when correlation is monitored.
Concept diagram
PHYSICAL-AWARE LOOP
topo compile -> congestion hints -> handoff -> PD correlationMetric graph
CORRELATION DELTA
logic view WNS ███████
topo view WNS █████
route trial WNS ████Reports and artifacts
topo QoR
congestion heatmap
handoff manifest
delta compare vs PD
Mini case study
Topo compile looked clean, but hotspot congestion predicted route failure and prevented late ECO churn.
Debug branches
Check hotspot ownership
Bound correlation drift
Escalate if handoff assumptions stale
Senior review question
Ask: what evidence proves this QoR move is real and stable?
Key takeaways
State exact run context (RTL, SDC, libs, switches) with every QoR claim.
Re-run timing, area, and power regressions after each synthesis ECO.
Common pitfalls
Comparing runs with mismatched constraints or library views.
Timing-only fixes that violate power or area budgets.
Skipping equivalence checks after structural changes.