Synthesis & Logic Optimization · All levels
PD Handoff Reports: Design Space
Design Space for PD Handoff Reports.
Design space exploration
For PD Handoff Reports, options trade QoR gain, risk, and schedule.
Option A — conservative
Conservative constraints: helps predictability
Risk: slower PPA gains
Validate with: first-silicon safety
Option B — balanced
Balanced QoR tuning: helps stable closure
Risk: requires discipline
Validate with: typical product mode
Option C — aggressive compile
Aggressive compile push: helps fast timing recovery
Risk: power/hold regressions
Validate with: late schedule
Option D — structural change
Structural RTL change: helps long-term fix
Risk: schedule impact
Validate with: recurring bottleneck
DESIGN SPACE — PD Handoff Reports
QoR gain <-> regression risk <-> schedule pressureDesign pitfalls
Single-metric optimization
No rollback path
Weak run comparability
Tradeoff curve
BEFORE / AFTER QOR — PD Handoff Reports
QoR score
0 | --- target zone
-1 | ● regression
-2 | ● baseline
-0.5| ● after fix
+----------------------------------> iteration
Validate timing + area + power, not one number.Synthesis deep dive
Physical-aware synthesis reduces logic-to-route surprise when correlation is monitored.
Concept diagram
PHYSICAL-AWARE LOOP
topo compile -> congestion hints -> handoff -> PD correlationMetric graph
CORRELATION DELTA
logic view WNS ███████
topo view WNS █████
route trial WNS ████Reports and artifacts
topo QoR
congestion heatmap
handoff manifest
delta compare vs PD
Mini case study
Topo compile looked clean, but hotspot congestion predicted route failure and prevented late ECO churn.
Debug branches
Check hotspot ownership
Bound correlation drift
Escalate if handoff assumptions stale
Senior review question
Ask: what evidence proves this QoR move is real and stable?
Key takeaways
State exact run context (RTL, SDC, libs, switches) with every QoR claim.
Re-run timing, area, and power regressions after each synthesis ECO.
Common pitfalls
Comparing runs with mismatched constraints or library views.
Timing-only fixes that violate power or area budgets.
Skipping equivalence checks after structural changes.
Principal synthesis review addendum
Strong handoff packages constraints, scenario assumptions, and QoR baselines so PD can preserve intent and diagnose deltas quickly.
Metric: handoff completeness, view consistency, first-route QoR deviation