Synthesis & Logic Optimization · All levels

PD Handoff Reports: Inputs & Outputs

Inputs & Outputs for PD Handoff Reports.

Inputs and outputs contract

Inputs & Outputs for PD Handoff Reports focuses on handoff completeness, view consistency, first-route QoR deviation. The goal is to connect observed QoR movement to mechanism, ownership, and regression risk.

Synthesis closure fails when teams optimize against different assumptions. Treat these artifacts as a signed handoff contract.

diagram
INPUTS
  - RTL tag and compile switches
  - SDC / policy constraints
  - Library and operating views
  - Optional physical estimates (topo/congestion)

OUTPUTS
  - QoR timing/area/power reports
  - transform/mapping summaries
  - owner-tagged closure memo
  - regression matrix verdict

Flow sequence

diagram
SYNTHESIS FLOW — PD Handoff Reports

RTL + constraints
      |
      v
elaboration + checks
      |
      v
mapping + optimization
      |
      v
QoR reports (timing/area/power)
      |
      v
incremental ECO + regression

Primary metric: handoff completeness, view consistency, first-route QoR deviation

Ownership map

diagram
OWNERSHIP MAP — PD Handoff Reports

artifact              owner
----------------      -----------------
compile owner       synthesis lead
timing/power owner  PD lead
cross-team review   CAD owner

Every QoR movement needs a named owner before ECO.

Synthesis deep dive

Physical-aware synthesis reduces logic-to-route surprise when correlation is monitored.

Concept diagram

diagram
PHYSICAL-AWARE LOOP

topo compile -> congestion hints -> handoff -> PD correlation

Metric graph

diagram
CORRELATION DELTA

logic view WNS      ███████
topo view WNS       █████
route trial WNS     ████

Reports and artifacts

  • topo QoR

  • congestion heatmap

  • handoff manifest

  • delta compare vs PD

Mini case study

Topo compile looked clean, but hotspot congestion predicted route failure and prevented late ECO churn.

Debug branches

  • Check hotspot ownership

  • Bound correlation drift

  • Escalate if handoff assumptions stale

Senior review question

Ask: what evidence proves this QoR move is real and stable?

Key takeaways

  • State exact run context (RTL, SDC, libs, switches) with every QoR claim.

  • Re-run timing, area, and power regressions after each synthesis ECO.

Common pitfalls

  • Comparing runs with mismatched constraints or library views.

  • Timing-only fixes that violate power or area budgets.

  • Skipping equivalence checks after structural changes.

Principal synthesis review addendum

Strong handoff packages constraints, scenario assumptions, and QoR baselines so PD can preserve intent and diagnose deltas quickly.

Metric: handoff completeness, view consistency, first-route QoR deviation