Synthesis & Logic Optimization · All levels

PD Handoff Reports: Silicon PPA Impact

Silicon PPA Impact for PD Handoff Reports.

Silicon PPA and closure impact

Better pre-route estimates reduce painful handoff surprises.

Area drivers

  • Buffer growth

  • Cell mix shifts

  • Retiming duplication

Power drivers

  • Leakage from LVT

  • Clock power from gating/skew choices

Timing impact

  • Critical path depth changes

  • Hold/setup coupling

PD consequences

  • Congestion ripple

  • Handoff predictability

Verification burden

  • Equivalence burden

  • Regression matrix depth

diagram
PPA SNAPSHOT — PD Handoff Reports
area / dynamic / leakage / WNS / runtime

PPA takeaways

  • QoR wins must survive signoff checks

  • Correlation beats one-off gains

QoR snapshot

diagram
BEFORE / AFTER QOR — PD Handoff Reports

QoR score
  0 |                     --- target zone
 -1 |        ● regression
 -2 |             ● baseline
 -0.5|                  ● after fix
    +----------------------------------> iteration

Validate timing + area + power, not one number.

Synthesis deep dive

Physical-aware synthesis reduces logic-to-route surprise when correlation is monitored.

Concept diagram

diagram
PHYSICAL-AWARE LOOP

topo compile -> congestion hints -> handoff -> PD correlation

Metric graph

diagram
CORRELATION DELTA

logic view WNS      ███████
topo view WNS       █████
route trial WNS     ████

Reports and artifacts

  • topo QoR

  • congestion heatmap

  • handoff manifest

  • delta compare vs PD

Mini case study

Topo compile looked clean, but hotspot congestion predicted route failure and prevented late ECO churn.

Debug branches

  • Check hotspot ownership

  • Bound correlation drift

  • Escalate if handoff assumptions stale

Senior review question

Ask: what evidence proves this QoR move is real and stable?

Key takeaways

  • State exact run context (RTL, SDC, libs, switches) with every QoR claim.

  • Re-run timing, area, and power regressions after each synthesis ECO.

Common pitfalls

  • Comparing runs with mismatched constraints or library views.

  • Timing-only fixes that violate power or area budgets.

  • Skipping equivalence checks after structural changes.

Principal synthesis review addendum

Strong handoff packages constraints, scenario assumptions, and QoR baselines so PD can preserve intent and diagnose deltas quickly.

Metric: handoff completeness, view consistency, first-route QoR deviation