Synthesis & Logic Optimization · All levels
PD Handoff Reports: Step-by-Step Walkthrough
Step-by-Step Walkthrough for PD Handoff Reports.
Step-by-step analysis walkthrough
Use when you own PD Handoff Reports in a synthesis closure review.
Confirm exact run context (RTL/SDC/lib/switch set).
Open section QoR dashboard and identify first drift.
Inspect topic-level report for mechanism evidence.
Determine owner and candidate reversible action.
Apply one change only; avoid bundled fixes.
Run full timing/area/power checks.
Validate side effects on neighboring path groups.
Publish memo with outcome and residual risk.
Artifacts to collect
handoff manifest, baseline QoR snapshot, assumption checklist
QoR dashboard
run manifest
constraint diff
regression matrix
Decision memo template
SYNTHESIS DECISION MEMO — PD Handoff Reports
run context:
observed metric:
hypothesis:
fix:
regression:
owners: synthesis lead, PD lead, CAD ownerReference visuals
PD handoff package
netlist + SDC + scenario map
QoR baseline + assumptions
owner matrix + known risksSynthesis deep dive
Physical-aware synthesis reduces logic-to-route surprise when correlation is monitored.
Concept diagram
PHYSICAL-AWARE LOOP
topo compile -> congestion hints -> handoff -> PD correlationMetric graph
CORRELATION DELTA
logic view WNS ███████
topo view WNS █████
route trial WNS ████Reports and artifacts
topo QoR
congestion heatmap
handoff manifest
delta compare vs PD
Mini case study
Topo compile looked clean, but hotspot congestion predicted route failure and prevented late ECO churn.
Debug branches
Check hotspot ownership
Bound correlation drift
Escalate if handoff assumptions stale
Senior review question
Ask: what evidence proves this QoR move is real and stable?
Key takeaways
State exact run context (RTL, SDC, libs, switches) with every QoR claim.
Re-run timing, area, and power regressions after each synthesis ECO.
Common pitfalls
Comparing runs with mismatched constraints or library views.
Timing-only fixes that violate power or area budgets.
Skipping equivalence checks after structural changes.
Principal synthesis review addendum
Strong handoff packages constraints, scenario assumptions, and QoR baselines so PD can preserve intent and diagnose deltas quickly.
Metric: handoff completeness, view consistency, first-route QoR deviation