Worked example

Worked Example for PD Handoff Reports focuses on handoff completeness, view consistency, first-route QoR deviation. The goal is to connect observed QoR movement to mechanism, ownership, and regression risk.

A weekly compile reports handoff completeness, view consistency, first-route QoR deviation regression. Instead of random knob tuning, start by proving whether input context changed and which mechanism dominates.

Sequence under inspection

diagram
SYNTHESIS FLOW — PD Handoff Reports

RTL + constraints
      |
      v
elaboration + checks
      |
      v
mapping + optimization
      |
      v
QoR reports (timing/area/power)
      |
      v
incremental ECO + regression

Primary metric: handoff completeness, view consistency, first-route QoR deviation

PD handoff package

diagram
netlist + SDC + scenario map
QoR baseline + assumptions
owner matrix + known risks
  1. Capture baseline and regressed artifact pair.

  2. Confirm manifest parity (RTL, SDC, libs, switches).

  3. Pin first metric drift and mechanism hypothesis.

  4. Reproduce with handoff manifest, baseline QoR snapshot, assumption checklist.

  5. Apply one reversible fix and run matrix regression.

Did the fix hold?

diagram
BEFORE / AFTER QOR — PD Handoff Reports

QoR score
  0 |                     --- target zone
 -1 |        ● regression
 -2 |             ● baseline
 -0.5|                  ● after fix
    +----------------------------------> iteration

Validate timing + area + power, not one number.

Synthesis deep dive

Physical-aware synthesis reduces logic-to-route surprise when correlation is monitored.

Concept diagram

diagram
PHYSICAL-AWARE LOOP

topo compile -> congestion hints -> handoff -> PD correlation

Metric graph

diagram
CORRELATION DELTA

logic view WNS      ███████
topo view WNS       █████
route trial WNS     ████

Reports and artifacts

  • topo QoR

  • congestion heatmap

  • handoff manifest

  • delta compare vs PD

Mini case study

Topo compile looked clean, but hotspot congestion predicted route failure and prevented late ECO churn.

Debug branches

  • Check hotspot ownership

  • Bound correlation drift

  • Escalate if handoff assumptions stale

Senior review question

Ask: what evidence proves this QoR move is real and stable?

Key takeaways

  • State exact run context (RTL, SDC, libs, switches) with every QoR claim.

  • Re-run timing, area, and power regressions after each synthesis ECO.

Common pitfalls

  • Comparing runs with mismatched constraints or library views.

  • Timing-only fixes that violate power or area budgets.

  • Skipping equivalence checks after structural changes.

Principal synthesis review addendum

Strong handoff packages constraints, scenario assumptions, and QoR baselines so PD can preserve intent and diagnose deltas quickly.

Metric: handoff completeness, view consistency, first-route QoR deviation