Synthesis & Logic Optimization · All levels
Topographical Synthesis: Reports & Metrics
Reports & Metrics for Topographical Synthesis.
Reports and metrics
Reports & Metrics for Topographical Synthesis focuses on topo-vs-logic WNS delta, estimated wirelength, congestion hotspots. The goal is to connect observed QoR movement to mechanism, ownership, and regression risk.
A report is useful only when it supports decisions. For Topographical Synthesis, read metric movement with baseline context and expected budget.
Metric movement
QOR TREND — Topographical Synthesis
metric quality
^
| target band
| o o o
| o
| o regression
+----------------------------------> synthesis iteration
baseline tuning signoff-ready
Track: topo-vs-logic WNS delta, estimated wirelength, congestion hotspotsTrack topo-vs-logic WNS delta, estimated wirelength, congestion hotspots with exact run manifests.
Keep timing/area/power side-by-side in review dashboards.
Require one-sentence mechanism hypothesis for every major delta.
Store before/after artifacts with owner signoff.
Synthesis deep dive
Physical-aware synthesis reduces logic-to-route surprise when correlation is monitored.
Concept diagram
PHYSICAL-AWARE LOOP
topo compile -> congestion hints -> handoff -> PD correlationMetric graph
CORRELATION DELTA
logic view WNS ███████
topo view WNS █████
route trial WNS ████Reports and artifacts
topo QoR
congestion heatmap
handoff manifest
delta compare vs PD
Mini case study
Topo compile looked clean, but hotspot congestion predicted route failure and prevented late ECO churn.
Debug branches
Check hotspot ownership
Bound correlation drift
Escalate if handoff assumptions stale
Senior review question
Ask: what evidence proves this QoR move is real and stable?
Key takeaways
State exact run context (RTL, SDC, libs, switches) with every QoR claim.
Re-run timing, area, and power regressions after each synthesis ECO.
Common pitfalls
Comparing runs with mismatched constraints or library views.
Timing-only fixes that violate power or area budgets.
Skipping equivalence checks after structural changes.