Synthesis & Logic Optimization · All levels
Topographical Synthesis: Worked Example
Worked Example for Topographical Synthesis.
Worked example
Worked Example for Topographical Synthesis focuses on topo-vs-logic WNS delta, estimated wirelength, congestion hotspots. The goal is to connect observed QoR movement to mechanism, ownership, and regression risk.
A weekly compile reports topo-vs-logic WNS delta, estimated wirelength, congestion hotspots regression. Instead of random knob tuning, start by proving whether input context changed and which mechanism dominates.
Sequence under inspection
SYNTHESIS FLOW — Topographical Synthesis
RTL + constraints
|
v
elaboration + checks
|
v
mapping + optimization
|
v
QoR reports (timing/area/power)
|
v
incremental ECO + regression
Primary metric: topo-vs-logic WNS delta, estimated wirelength, congestion hotspotsTopographical estimate loop
logic compile
+ estimated placement/RC
-> topo QoR
-> PD correlation checkCapture baseline and regressed artifact pair.
Confirm manifest parity (RTL, SDC, libs, switches).
Pin first metric drift and mechanism hypothesis.
Reproduce with topo compile report, estimated placement map, QoR delta log.
Apply one reversible fix and run matrix regression.
Did the fix hold?
BEFORE / AFTER QOR — Topographical Synthesis
QoR score
0 | --- target zone
-1 | ● regression
-2 | ● baseline
-0.5| ● after fix
+----------------------------------> iteration
Validate timing + area + power, not one number.Synthesis deep dive
Physical-aware synthesis reduces logic-to-route surprise when correlation is monitored.
Concept diagram
PHYSICAL-AWARE LOOP
topo compile -> congestion hints -> handoff -> PD correlationMetric graph
CORRELATION DELTA
logic view WNS ███████
topo view WNS █████
route trial WNS ████Reports and artifacts
topo QoR
congestion heatmap
handoff manifest
delta compare vs PD
Mini case study
Topo compile looked clean, but hotspot congestion predicted route failure and prevented late ECO churn.
Debug branches
Check hotspot ownership
Bound correlation drift
Escalate if handoff assumptions stale
Senior review question
Ask: what evidence proves this QoR move is real and stable?
Key takeaways
State exact run context (RTL, SDC, libs, switches) with every QoR claim.
Re-run timing, area, and power regressions after each synthesis ECO.
Common pitfalls
Comparing runs with mismatched constraints or library views.
Timing-only fixes that violate power or area budgets.
Skipping equivalence checks after structural changes.
Principal synthesis review addendum
Topographical mode estimates physical effects during synthesis to reduce handoff surprises between logic and implementation views.
Metric: topo-vs-logic WNS delta, estimated wirelength, congestion hotspots