CDC / RDC · All levels
Chip-level RDC Closure: Reports & Metrics
Reports & Metrics for Chip-level RDC Closure.
Reports and metrics
Reports & Metrics for Chip-level RDC Closure focuses on top-level RDC open count, subsystem handoff completeness, integration churn. The goal is to convert issue observations into mechanism-backed closure decisions.
Reports must explain risk movement in top-level RDC open count, subsystem handoff completeness, integration churn, not just issue counts. A report is complete only when ownership and closure action are explicit.
Metric movement
METRIC TREND — top-level RDC open count, subsystem handoff completeness, integration churn
critical open issues
^
| target (0 critical)
| - - - - - - - - - -
| o post triage
| o initial run
| o baseline
+--------------------------------------> review iteration
Always pair count trend with evidence quality trend.Risk distribution
RISK HEATMAP — Chip-level RDC Closure
severity
high | XX X
medium | XXX XX
low | XXX XXX
+----------------------------> ownership readiness
unassigned in-progress closed
Metric focus: top-level RDC open count, subsystem handoff completeness, integration churnTrack top-level RDC open count, subsystem handoff completeness, integration churn by block, mode, and severity.
Separate structural warnings from behavior-proven hazards.
Show waiver age and owner SLA alongside raw counts.
Store evidence links with each closure claim.
CDC/RDC deep dive
RDC closure must connect IP assumptions to SoC reality.
Concept diagram
RDC CLOSURE
IP reset intent + SoC sequencing -> structural checks -> dynamic stress -> signoffMetric graph
MILESTONE READINESS
M-2 55%
M-1 82%
M0 100%Reports and artifacts
top-level RDC opens
reset simulation coverage
chip integration blockers
waiver backlog
Mini case study
Each IP was locally clean, but top-level sequencing violation created cross-subsystem boot intermittency.
Debug branches
Audit subsystem assumptions
stress chip-level reset scenarios
close ownership gaps
Senior review question
Ask: what evidence proves this risk is closed for silicon, not just tool-clean?
Key takeaways
State crossing class, assumptions, and owner with every issue.
Run structural and dynamic regressions after each fix.
Common pitfalls
Treating all warnings as equivalent risk.
Waiving issues without containment evidence.
Skipping reset and reconvergence stress after CDC fixes.