CDC / RDC · All levels
Chip-level RDC Closure: Step-by-Step Walkthrough
Step-by-Step Walkthrough for Chip-level RDC Closure.
Step-by-step analysis walkthrough
Use this sequence when owning Chip-level RDC Closure in a signoff review.
Inspect warning class and severity.
Trace crossing endpoints and domains.
Check protocol/reset assumptions against spec.
Review synchronizer or FIFO implementation detail.
Run focused assertion or formal check.
Draft fix options with risk and schedule impact.
Execute regression and publish closure memo.
Artifacts to collect
SoC reset map, subsystem waiver list, integration closure report
crossing inventory
waiver board notes
regression report
Decision memo template
CDC/RDC DECISION MEMO — Chip-level RDC Closure
risk class:
mechanism:
evidence:
fix/waiver:
owners: SoC lead, RDC lead, IP ownersReference visuals
SoC reset map
IP A reset tree ---IP B reset tree ----+--> SoC dependency graph
IP C reset tree ---/
Top-level closure fails when IP assumptions conflict.CDC/RDC deep dive
RDC closure must connect IP assumptions to SoC reality.
Concept diagram
RDC CLOSURE
IP reset intent + SoC sequencing -> structural checks -> dynamic stress -> signoffMetric graph
MILESTONE READINESS
M-2 55%
M-1 82%
M0 100%Reports and artifacts
top-level RDC opens
reset simulation coverage
chip integration blockers
waiver backlog
Mini case study
Each IP was locally clean, but top-level sequencing violation created cross-subsystem boot intermittency.
Debug branches
Audit subsystem assumptions
stress chip-level reset scenarios
close ownership gaps
Senior review question
Ask: what evidence proves this risk is closed for silicon, not just tool-clean?
Key takeaways
State crossing class, assumptions, and owner with every issue.
Run structural and dynamic regressions after each fix.
Common pitfalls
Treating all warnings as equivalent risk.
Waiving issues without containment evidence.
Skipping reset and reconvergence stress after CDC fixes.
Principal CDC/RDC review addendum
Chip-level RDC closure depends on clean reset intent handoff from IPs and alignment between subsystem sequencing assumptions.
Metric: top-level RDC open count, subsystem handoff completeness, integration churn