CDC / RDC · All levels
RDC Methodology: Step-by-Step Walkthrough
Step-by-Step Walkthrough for RDC Methodology.
Step-by-step analysis walkthrough
Use this sequence when owning RDC Methodology in a signoff review.
Inspect warning class and severity.
Trace crossing endpoints and domains.
Check protocol/reset assumptions against spec.
Review synchronizer or FIFO implementation detail.
Run focused assertion or formal check.
Draft fix options with risk and schedule impact.
Execute regression and publish closure memo.
Artifacts to collect
RDC methodology guide, rule-set config, hazard taxonomy
crossing inventory
waiver board notes
regression report
Decision memo template
CDC/RDC DECISION MEMO — RDC Methodology
risk class:
mechanism:
evidence:
fix/waiver:
owners: RDC lead, methodology owner, verification leadReference visuals
RDC methodology loop
intent capture -> structural run -> dynamic proof
-> waiver board -> milestone gate -> archiveCDC/RDC deep dive
RDC closure must connect IP assumptions to SoC reality.
Concept diagram
RDC CLOSURE
IP reset intent + SoC sequencing -> structural checks -> dynamic stress -> signoffMetric graph
MILESTONE READINESS
M-2 55%
M-1 82%
M0 100%Reports and artifacts
top-level RDC opens
reset simulation coverage
chip integration blockers
waiver backlog
Mini case study
Each IP was locally clean, but top-level sequencing violation created cross-subsystem boot intermittency.
Debug branches
Audit subsystem assumptions
stress chip-level reset scenarios
close ownership gaps
Senior review question
Ask: what evidence proves this risk is closed for silicon, not just tool-clean?
Key takeaways
State crossing class, assumptions, and owner with every issue.
Run structural and dynamic regressions after each fix.
Common pitfalls
Treating all warnings as equivalent risk.
Waiving issues without containment evidence.
Skipping reset and reconvergence stress after CDC fixes.
Principal CDC/RDC review addendum
RDC methodology treats reset behavior as a first-class asynchronous interface requiring intent capture, structural checks, and targeted dynamic proof.
Metric: reset-domain hazard coverage, unresolved RDC severity count, closure quality