For Jitter Budgeting, closure options trade robustness, schedule, and margin.
Conservative boundary guard: helps high robustness
Risk: area and schedule cost
Validate with: first-silicon risk
Balanced integration policy: helps practical closure
Risk: needs discipline
Validate with: production ramp
Aggressive late ECO: helps quick symptom relief
Risk: cross-domain regressions
Validate with: deadline crunch
Architecture-level reshaping: helps durable fix
Risk: long lead time
Validate with: repeat offenders
DESIGN SPACE — Jitter Budgeting
robustness <-> performance <-> schedule
choose by total jitter budget, deterministic/random split, downstream timing margin on product-representative scenariosMode coverage too shallow
Fixing symptom without ownership alignment
BEFORE / AFTER — Jitter Budgeting
health score
^
| --- target
| o regressed
| o before fix
| o after bounded fix
+--------------------------------------> debug iteration
Prove signal quality, timing margin, and integration safety together.Clock quality evidence must include jitter and sequencing, not lock status alone.
CLOCKING FLOW
reference -> PLL/DLL -> distribution -> endpoint marginJITTER TREND
jitter ps
^
| o baseline
| o stress mode
| o failure edgejitter budget
lock/unlock counters
phase-noise snapshot
STA uncertainty deltas
False-lock condition released reset early; endpoint logic sampled unstable clock edge patterns.
Lock qualification policy
Reset sequencing check
Package/supply contributors
Ask: what boundary condition proves this topic is actually closed?
State boundary, mode, and evidence tag with every claim.
Always align analog, digital, and physical owners before signoff decisions.
Fixing averages while tails still fail.
Skipping package/supply evidence in jitter or SerDes issues.
Shipping with waivers that lack owner and expiration criteria.
System timing margin is consumed by source jitter, transfer jitter, supply noise, and distribution skew; the budget must close from reference clock to endpoint sampler.
Metric: total jitter budget, deterministic/random split, downstream timing margin
This content block can't be displayed here.
Block type: unknown
This content block can't be displayed here.
Block type: unknown
This content block can't be displayed here.
Block type: unknown