Hierarchical Floorplanning — Review Checklist
Review Checklist for Hierarchical Floorplanning (Floorplanning Expanded).
Review gate
Parent-child revision matrix is current and explicit.
Boundary/obstruction deltas are reviewed per release.
Reserved channels are verified against latest abstract.
Interface timing and power budgets are refreshed after geometry changes.
Integration drop has rollback path to prior known-good revision.
Smoke check (5 minutes)
Every checklist item has an owner
Failed items have mitigation or waiver ID
Definition of done for a senior owner
The exact database tag and analysis setup are recorded.
The primary metric is clean or accepted by waiver: Parent-child abstract consistency report.
The fix is explained by mechanism, not by tool folklore.
Regression coverage includes the obvious downstream domains: SoC assembly, partition timing closure, and signoff schedule are tied to hierarchical consistency..
Residual risk has an owner, approval path, and expiration date.
The lesson is captured as a methodology guardrail if it can recur.
Smoke check (5 minutes)
Could another engineer reproduce the conclusion from the notes alone?
Would you sign this off if the design came from another team?
Deep dive: how this shows up in real closure
Floorplan quality is the earliest predictor of place-and-route pain.
Reports and artifacts to inspect
floorplan summary: core area, macro area, std-cell utilization
macro/channel review: pin-facing sides, halos, routing channels
power plan preview: ring width, strap pitch, follow-pin connectivity
trial route congestion: overflow around macro corners and pin fields
Mini case study
A 2 MB SRAM cluster is placed with pins facing the die edge. Trial route shows red overflow along the north edge. A senior PD answer is to rotate or mirror the SRAM, open the channel, and re-run trial route before attempting timing optimization.
Debug branches
If congestion is local to macro corners, inspect pin sides and halo width before reducing global utilization.
If IR is weak at the core edge, widen the ring or add edge straps before adding random decaps.
If timing paths cross the whole block, review pin assignment and macro orientation before post-route ECO.
Senior review question
Ask yourself: what single report line would prove this page's concept is either passing or failing?
What changes at 10+ years
You are expected to predict what your fix can break before running it.
You should recognize when the issue is methodology, not one block's implementation.
You should communicate risk in tapeout language: owner, evidence, impact, mitigation, and decision date.
Principal-level review bar
Deep subpage pages in this course should be read like real closure review material. For a 10+ year PD engineer, the bar is not remembering terminology; it is making a release-quality decision under ambiguity.
What excellent looks like
Names the failing metric, corner/mode, database tag, and analysis switches before proposing a fix.
Separates data, constraint, physical, tool, and methodology root causes instead of treating all failures as optimization problems.
Chooses experiments by information gain and reversibility, not by habit.
States regression blast radius across timing, route, power, PV, DFT, package, and tapeout manifest.
Turns recurring failures into methodology guardrails, dashboards, or checklist items.
Closure note template
STAFF / PRINCIPAL CLOSURE NOTE
Context:
stage: <pre-CTS | post-CTS | post-route | post-fill | signoff>
tag: <database / netlist / SDC / library stack>
failing metric: <exact report line>
affected scope: <block / hierarchy / path group / power domain / region>
Hypotheses:
H1: <most likely physical or constraint mechanism>
H2: <competing explanation>
H3: <methodology or input-data issue>
Decision:
next experiment: <cheap check that can falsify H1>
fix candidate: <minimal reversible change>
rollback trigger: <metric that says the fix is wrong>
regression set: <timing / route / power / PV / DFT / package>
escalation owner: <team or reviewer>Tradeoffs a senior engineer must discuss
Technical tradeoff
Floorplan quality is the earliest predictor of place-and-route pain. Explain not only the preferred fix, but what margin or schedule you are spending to get it.
Cross-team tradeoff
What must RTL, synthesis, CAD, STA, DFT, package, IP, or foundry agree to before this decision is final?
Which artifact becomes the source of truth after the decision: report, waiver, manifest, ECO script, or methodology deck?
What is the cost of being wrong: one rerun, ECO churn, mask risk, performance loss, or silicon escape?
Leadership communication
"The current blocker is <metric> in <corner/mode/stage>. The leading cause is <mechanism>. I recommend <fix> because it is bounded and reversible. The regression surface is <domains>. If it fails, we escalate to <owner> with <evidence>."Key takeaways
Always connect the concept back to a measurable signoff artifact.
A fix is not complete until you can name the regression checks.
Common pitfalls
Optimizing by habit instead of reading the current report.
Forgetting that a local fix can regress timing, routing, power, or PV elsewhere.