Physical Design · All levels
Tapeout Checklist Engineering — Review Checklist
Review Checklist for Tapeout Checklist Engineering (Signoff and Tapeout).
Review gate
Inputs versioned and match RTL/SDC tag
Primary metric meets spec or documented waiver
Regression list executed on tagged database
Risks logged with owner and date
Handoff notes updated for next stage
Smoke check (5 minutes)
Every checklist item has an owner
Failed items have mitigation or waiver ID
Definition of done for a senior owner
The exact database tag and analysis setup are recorded.
The primary metric is clean or accepted by waiver: Signoff and Tapeout closure dashboard.
The fix is explained by mechanism, not by tool folklore.
Regression coverage includes the obvious downstream domains: Foundry handoff acceptance and compliance..
Residual risk has an owner, approval path, and expiration date.
The lesson is captured as a methodology guardrail if it can recur.
Smoke check (5 minutes)
Could another engineer reproduce the conclusion from the notes alone?
Would you sign this off if the design came from another team?
Deep dive: how this shows up in real closure
Tapeout is an auditable decision backed by tagged artifacts.
Reports and artifacts to inspect
closure dashboard: timing, power, PV, DFT, package, and open waivers
revision manifest: RTL, netlist, SDC, GDS/OASIS, library, rule deck
waiver register: rule, count, owner, approver, expiration
foundry handoff package checklist
Mini case study
Timing and power are green, but the GDS tag differs from the STA database tag. The design is not ready. Reconcile the manifest and rerun signoff on the exact export database.
Debug branches
If a metric is yellow, name the owner, date, and mitigation before signoff review.
If the tag is mismatched, stop export; traceability is a hard gate.
If post-mask ECO is requested, confirm allowed metal layers before promising a fix.
Senior review question
Ask yourself: what single report line would prove this page's concept is either passing or failing?
What changes at 10+ years
You are expected to predict what your fix can break before running it.
You should recognize when the issue is methodology, not one block's implementation.
You should communicate risk in tapeout language: owner, evidence, impact, mitigation, and decision date.
Principal-level review bar
Deep subpage pages in this course should be read like real closure review material. For a 10+ year PD engineer, the bar is not remembering terminology; it is making a release-quality decision under ambiguity.
What excellent looks like
Names the failing metric, corner/mode, database tag, and analysis switches before proposing a fix.
Separates data, constraint, physical, tool, and methodology root causes instead of treating all failures as optimization problems.
Chooses experiments by information gain and reversibility, not by habit.
States regression blast radius across timing, route, power, PV, DFT, package, and tapeout manifest.
Turns recurring failures into methodology guardrails, dashboards, or checklist items.
Closure note template
STAFF / PRINCIPAL CLOSURE NOTE
Context:
stage: <pre-CTS | post-CTS | post-route | post-fill | signoff>
tag: <database / netlist / SDC / library stack>
failing metric: <exact report line>
affected scope: <block / hierarchy / path group / power domain / region>
Hypotheses:
H1: <most likely physical or constraint mechanism>
H2: <competing explanation>
H3: <methodology or input-data issue>
Decision:
next experiment: <cheap check that can falsify H1>
fix candidate: <minimal reversible change>
rollback trigger: <metric that says the fix is wrong>
regression set: <timing / route / power / PV / DFT / package>
escalation owner: <team or reviewer>Tradeoffs a senior engineer must discuss
Technical tradeoff
Tapeout is an auditable decision backed by tagged artifacts. Explain not only the preferred fix, but what margin or schedule you are spending to get it.
Cross-team tradeoff
What must RTL, synthesis, CAD, STA, DFT, package, IP, or foundry agree to before this decision is final?
Which artifact becomes the source of truth after the decision: report, waiver, manifest, ECO script, or methodology deck?
What is the cost of being wrong: one rerun, ECO churn, mask risk, performance loss, or silicon escape?
Leadership communication
"The current blocker is <metric> in <corner/mode/stage>. The leading cause is <mechanism>. I recommend <fix> because it is bounded and reversible. The regression surface is <domains>. If it fails, we escalate to <owner> with <evidence>."Key takeaways
Always connect the concept back to a measurable signoff artifact.
A fix is not complete until you can name the regression checks.
Common pitfalls
Optimizing by habit instead of reading the current report.
Forgetting that a local fix can regress timing, routing, power, or PV elsewhere.