Reports & Metrics for Package SI/PI Contracts focuses on SI/PI margin violations, package-driven timing regressions. The goal is to map symptoms to boundary contracts, owner actions, and regression-proof closure.
The job of a report is to convert SI/PI margin violations, package-driven timing regressions into a closure decision. One summary number is never enough without baseline, owner, and boundary context.
METRIC GRAPH — SI/PI margin violations, package-driven timing regressions
integration confidence
^
| target
| - - - - - - -
| o post-fix + regression
| o
| o baseline
| o failing run
+--------------------------------------> closure iteration
baseline freeze owner fix full matrix
Readout:
- compare results on the same manifest baseline
- state owner and boundary with every metric movementRISK HISTOGRAM — Package SI/PI Contracts
issue count
| ***
| *******
| ***********
|************* <- critical tail
+--------------------> risk severity
low medium high
Debug the high-severity tail first; averages hide escape risk.Track SI/PI margin violations, package-driven timing regressions by domain and owner boundary.
Store baseline manifest beside every metric snapshot.
Report both immediate fix result and full regression result.
Explicitly call out residual risk and ownership.
Package assumptions must be treated as first-class chip constraints.
PACKAGE CO-DESIGN
die io <-> package routing <-> board constraintsPACKAGE RISK MIX
SI margin █████
power integrity ████
lane mapping ███bump map revision log
SI/PI margin report
IO co-design checklist
package bring-up failures
Link degradation on product board came from package routing assumptions not reflected in pre-silicon model.
Compare package model versions
Audit lane mapping
Correlate SI/PI margins to failures
Ask: what baseline, owner, and artifact prove this topic is truly closed?
State baseline manifest and owner with every closure metric.
Run cross-domain regression after every top-level fix.
Comparing results across different manifests.
Unowned issues slipping through review cycles.
Waiving risks without expiry and validation plan.
This content block can't be displayed here.
Block type: unknown
This content block can't be displayed here.
Block type: unknown