Skip to lesson

Course contents

  • How to Use This Course
  • The NanoSoC Tour
  • Reading Path
  • SoC Glossary10
  • SoC Metrics Reference
  • SoC Cheatsheet
  • What SoC Integration Is12
    • The Integrator Role and Handoffs
    • Spec to Tapeout Flow
      • Milestones, Deliverables and Freezes
      • Where Integration Bugs Are Cheapest
      • Integration Reviews and Gates
    • Contracts and Ownership
    • Reading the SoC Spec
  • Architecture and Budgets21
  • Memory Maps and Address Decode26
  • Interconnect and Bus Fabrics26
  • Clock and Reset Architecture24
  • Power Architecture21
  • Interrupts, DMA and Peripherals15
  • Memories, Boot and Security21
  • IP Integration and Handoff21
  • Top-Level Verification and Bring-up21
  • Package, Pads and I/O18
  • Chip Signoff and Tapeout18
  • SoC Interview Prep16
  • Capstone: Integrate NanoSoC14
Loading lesson

←Spec to Tapeout Flow
  1. Topics
  2. SoC Design
  3. What SoC Integration Is
  4. Spec to Tapeout Flow
  5. Milestones, Deliverables and Freezes
On this page

    Part 1 of 14, lesson 4 of 12Part 1 of 14/What SoC Integration Is/Lesson 4 of 12All levels

    Milestones, Deliverables and Freezes

    The seven gates from specification to tapeout, what each delivers, and what freezes at each.

    Why it matters

    NanoSoC boots in 12.581 milliseconds, and only 53.948 microseconds of that, about four tenths of one percent, is the hardware reset sequence. Everything else is software running on tables the integrator froze months earlier: the map, the headers, the linker script, the boot image layout. When a late change moves one of those tables, the cost is not the edit; it is rebuilding and requalifying every consumer. Milestones exist to say, per artefact, after which date that rebuild needs a formal change, not a quiet edit. The gates below say, per artefact, where that line is crossed.

    The core idea

    Seven milestone gates in order; each gate freezes the artefacts the next stage builds on.
    The seven milestone gates from specification to tapeout.

    Gate

    Delivers

    Freezes

    Integrator's exit proof

    Specification

    Requirements, use cases, constraints

    What the chip must do, not how

    Every requirement has an owner and a budget line

    Architecture and budgets

    Map skeleton, domains, budget ledger

    Partition plan and per-block budgets

    Budgets sum within the envelope with margin

    RTL and handoffs

    Block bundles per the eight-item list

    Block behaviour and collateral

    Acceptance gate: every bundle complete or dated-waived

    Integration

    Wired top, decoders, sequences, headers

    Shared tables at revision 1

    Checkers green: overlap, wiring, reset order

    Verification closure

    Connectivity, boot, DMA, interrupt proof

    Test plan; only waivers move

    Coverage and the top-level test list signed

    Physical and signoff

    Closed netlist, DFT insertion and test modes, power intent, pin map, PG

    Netlist, constraints, pin map, test modes, power-intent revision

    Equivalence on every ECO; scan coverage and power-intent checks green

    Tapeout and bring-up

    Masks, boot image, errata process live

    Silicon; software works around

    Day-zero triage plan and debug access proven

    Two freezes deserve emphasis because newcomers fight them. The shared tables freeze at integration: after that, adding a peripheral takes a reserved slot and moving a base needs a change control, never a quiet edit. The netlist freezes at physical signoff: after that, even a one-gate fix is an ECO with equivalence proof, because the netlist must stay logically equivalent to the verified RTL.

    Worked arithmetic: where boot time really goes

    The script below recomputes the NanoSoC reset release chain and the boot shares from the NanoSoC specification, and asserts the proportions this lesson quoted: the hardware sequence is 53.948 microseconds, boot totals 12,580.917 microseconds, and the SPI image load dominates at 86.9 percent. Run this shape of accounting at every gate and late surprises shrink: anyone proposing to halve boot time can see at once that only the SPI load and the banner matter.

    example.py
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    T_PER, T_SYS, T_CPU = 41.667, 10.417, 5.208  # ns; NanoSoC specification periods
    r1 = 1024 * T_PER          # oscillator ready
    r2 = 2 * T_PER             # rst_per_n release
    r3 = 260 * T_PER           # PLL enable and lock
    r4 = 2 * T_PER             # clock gates open
    r5 = 18 * T_SYS            # rst_sys_n release
    r6 = 8 * T_SYS + 2 * T_CPU  # rst_cpu_n release, last
    hw_us = (r1 + r2 + r3 + r4 + r5 + r6) / 1000
    assert abs(hw_us - 53.948) < 0.01, hw_us
    
    boot_us = 12580.917        # NanoSoC specification boot total
    spi_us, banner_us = 10928.000, 1386.667
    assert abs(spi_us / boot_us - 0.869) < 0.001
    assert abs(banner_us / boot_us - 0.110) < 0.001
    assert abs(hw_us / boot_us - 0.0043) < 0.0005
    rest = boot_us - spi_us - banner_us - hw_us
    assert abs(rest / boot_us - 0.017) < 0.003, rest
    print("PASS: reset chain 53.948 us; SPI 86.9%, banner 11.0%, reset 0.43%")

    What the review looks for

    • Each gate's exit proof is attached to the gate record, not remembered in meeting notes.

    • Frozen artefacts carry versions, and every consumer names the version it built against.

    • Any change after a freeze arrives as a change control with impact and requalification listed.

    Verify and debug

    When a late bug appears, first ask which freeze it breaks: a moved base breaks the integration freeze, a new constraint breaks the handoff freeze, a netlist tweak breaks the signoff freeze. The answer routes the fix and prices it, which is the next lesson. For the implementation steps inside physical design see PD Flow Overview; for the synthesis box see Synthesis Flow Overview; for where chip-level verification sits see Levels and What They See.

    Test mode not disabled in mission mode: a scan-enable or test-mode pin left floating, or shared with a functional pin, so the chip sits in scan or shifts randomly. It is a pin-map and test-mode freeze failure. The physical gate must freeze the test-mode pin states and tie or strap them, and the bring-up plan reads the mode status before anything else.

    If asked to plan a chip schedule, answer in freezes, not months: name what locks at each gate and what evidence releases it. Dates follow from the evidence.

    Check yourself Software asks to move the SBR base one slot later, after the integration freeze. What happens?

    It becomes a change control: impact on headers, linker script, decoder and tests is listed, all consumers regenerate and requalify, and the default answer is to take a reserved slot instead. Quiet edits after a freeze are how two teams ship against different maps.

    Related topics

    • Next: Where Integration Bugs Are Cheapest

    • PD: PD Flow Overview

    • Verification: Pre-Silicon and Post-Silicon

    Previous

    9 / 289

    Next: Where Integration Bugs Are Cheapest

    Up next

    Up nextWhere Integration Bugs Are Cheapest

    Sign in to save progress

    Practice this lessonPrevious lessonReport an error

    See also

    • Integration Reviews and Gates