ECO Regression Matrix: Inputs & Outputs
Inputs & Outputs for ECO Regression Matrix.
Inputs and outputs contract
Inputs & Outputs for ECO Regression Matrix focuses on corners re-run, new violations introduced, signoff delta. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
Treat these as a signed interface contract. Ambiguity here is the single biggest source of wasted integration weeks, because two teams debug against different assumptions.
INPUTS
- SDC (clocks, IO delays, exceptions)
- Liberty libraries per corner
- SPEF/parasitics and RC corner
- MMMC scenario definition
OUTPUTS
- WNS/TNS reports per scenario
- path group summaries
- constraint audit / waiver log
- signoff closure memoTiming path sequence
TIMING PATH — ECO Regression Matrix
launch FF --logic stages--> capture FF
| |
launch clock capture clock
| |
required: arrival < capture_edge - setup
metric: corners re-run, new violations introduced, signoff deltaOwnership map
OWNERSHIP MAP — ECO Regression Matrix
artifact owner
---------------- -----------------
timing report STA lead
SDC/constraint CAD owner
implementation program lead
Every WNS cluster needs a named owner before ECO.STA deep dive
ECO without regression is a coin flip.
Concept diagram
ECO LOOP
failing path -> fix -> setup check -> hold check -> SI -> MMMC matrixMetric graph
ECO PROGRESS
WNS
0 | o target
-50| o
-100| o baseline
+-----------------> ECO #Reports and artifacts
pre/post WNS
hold delta
leakage delta
ECO ticket log
Mini case study
48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.
Debug branches
Never ship setup-only proof
Logical ECO needs equivalence
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
Every ECO must re-run the agreed MMMC matrix plus SI; regression hygiene prevents shipping a fix that breaks another corner.
Metric: corners re-run, new violations introduced, signoff delta