STA Mastery · All levels
ECO Timing Closure
Setup/hold closure order, physical vs logical ECO, useful skew, sizing, VT swap, and regression discipline.
Section goal
Setup/hold closure order, physical vs logical ECO, useful skew, sizing, VT swap, and regression discipline.
How to study this section
Start with the topic hub to learn the contract.
Use mechanism and reports pages to connect rules to metrics.
Use debug and worked-example pages for interview and on-call practice.
Close with checklist and PPA impact before signing any change.
Topics
setup-hold-closure-order/ — Setup / Hold Closure Order
eco-physical-vs-logical/ — ECO Physical vs Logical
useful-skew-tradeoffs/ — Useful Skew Tradeoffs
eco-regression-matrix/ — ECO Regression Matrix
Related topics
STA deep dive
ECO without regression is a coin flip.
Concept diagram
ECO LOOP
failing path -> fix -> setup check -> hold check -> SI -> MMMC matrixMetric graph
ECO PROGRESS
WNS
0 | o target
-50| o
-100| o baseline
+-----------------> ECO #Reports and artifacts
pre/post WNS
hold delta
leakage delta
ECO ticket log
Mini case study
48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.
Debug branches
Never ship setup-only proof
Logical ECO needs equivalence
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?