STA Mastery · All levels

ECO Regression Matrix: Reports & Metrics

Reports & Metrics for ECO Regression Matrix.

Reports and metrics

Reports & Metrics for ECO Regression Matrix focuses on corners re-run, new violations introduced, signoff delta. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.

The job of a report is to turn corners re-run, new violations introduced, signoff delta into a closure decision. A single WNS number is almost never enough; you need path group breakdown, cell vs net split, and a clear gap between current slack and signoff target.

Metric movement

diagram
METRIC GRAPH — corners re-run, new violations introduced, signoff delta

WNS (ps)
  ^
  |                         target (0)
  |                       - - - - - - -
  |                  o after ECO + hold check
  |              o
  |         o baseline run
  |    o failing regression
  +--------------------------------------> closure iteration
    view audit     path group fix     MMMC signoff

Readout:
  - explain why WNS/TNS moved and which path group drove the change

Slack distribution

diagram
SLACK HISTOGRAM — ECO Regression Matrix

path count
  |      ***
  |    *******
  |  ***********
  |*************  <- WNS (worst path)
  +--------------------> slack (ns)
  -0.15  0.0  0.10

Fix the left tail first; average slack misleads.
  • Track corners re-run, new violations introduced, signoff delta by path group, corner, and analysis view.

  • Report WNS/TNS and failing endpoint count together.

  • Include setup and hold splits; they often diverge after ECO.

  • Always store the metric next to the artifact that produced it.

STA deep dive

ECO without regression is a coin flip.

Concept diagram

diagram
ECO LOOP

failing path -> fix -> setup check -> hold check -> SI -> MMMC matrix

Metric graph

diagram
ECO PROGRESS

WNS
 0 |              o target
-50|        o
-100|   o baseline
    +-----------------> ECO #

Reports and artifacts

  • pre/post WNS

  • hold delta

  • leakage delta

  • ECO ticket log

Mini case study

48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.

Debug branches

  • Never ship setup-only proof

  • Logical ECO needs equivalence

Senior review question

Ask: what corner/mode/view proves this topic is closed or failing?

Key takeaways

  • State corner, mode, view, and database tag with every slack claim.

  • Run setup and hold plus MMMC regression after every ECO.

Common pitfalls

  • Comparing STA runs with different SPEF or SDC tags.

  • Broad false_path to green-wash violations.

  • Setup-only ECO without hold check.

Reading reports