STA Mastery · All levels

Setup / Hold Closure Order: Review Checklist

Review Checklist for Setup / Hold Closure Order.

Review checklist

Review Checklist for Setup / Hold Closure Order focuses on setup WNS, hold WNS, simultaneous violation count. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.

  • SDC revision and implemented clock/exception policy are named.

  • Clock/reset and CDC assumptions are reviewed.

  • Path groups, IO delays, and exception rationale are documented.

  • MMMC scenario list maps back to signoff requirements.

  • WNS/TNS artifact stored with corner/mode/view tags.

  • Owners signed: timing closure lead, PD owner, STA owner.

Sign-off ownership

diagram
OWNERSHIP MAP — Setup / Hold Closure Order

artifact              owner
----------------      -----------------
timing report       timing closure lead
SDC/constraint      PD owner
implementation      STA owner

Every WNS cluster needs a named owner before ECO.

STA deep dive

ECO without regression is a coin flip.

Concept diagram

diagram
ECO LOOP

failing path -> fix -> setup check -> hold check -> SI -> MMMC matrix

Metric graph

diagram
ECO PROGRESS

WNS
 0 |              o target
-50|        o
-100|   o baseline
    +-----------------> ECO #

Reports and artifacts

  • pre/post WNS

  • hold delta

  • leakage delta

  • ECO ticket log

Mini case study

48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.

Debug branches

  • Never ship setup-only proof

  • Logical ECO needs equivalence

Senior review question

Ask: what corner/mode/view proves this topic is closed or failing?

Key takeaways

  • State corner, mode, view, and database tag with every slack claim.

  • Run setup and hold plus MMMC regression after every ECO.

Common pitfalls

  • Comparing STA runs with different SPEF or SDC tags.

  • Broad false_path to green-wash violations.

  • Setup-only ECO without hold check.

Principal STA review addendum

Setup and hold compete through delay changes; closure order and ECO type must avoid fixing one at the expense of the other.

Metric: setup WNS, hold WNS, simultaneous violation count