STA Mastery · All levels
Setup / Hold Closure Order: Design Space
Design Space for Setup / Hold Closure Order.
Design space exploration
For Setup / Hold Closure Order, closure options trade margin, schedule, and regression risk.
Option A — conservative
Conservative margin: helps safe signoff
Risk: over-pessimism, area/power
Validate with: first silicon
Option B — balanced
Balanced derate: helps reasonable margin
Risk: needs approval
Validate with: mature node
Option C — aggressive ECO
Aggressive ECO: helps fast WNS gain
Risk: hold/SI regressions
Validate with: late schedule
Option D — RTL restructure
RTL restructure: helps structural fix
Risk: schedule hit
Validate with: chronic paths
DESIGN SPACE — Setup / Hold Closure Order
margin <-> performance <-> schedule
pick based on setup WNS, hold WNS, simultaneous violation count on product scenariosDesign pitfalls
ECO without regression matrix
Constraint change without audit
Tradeoff curve
BEFORE / AFTER ECO — Setup / Hold Closure Order
WNS (ps)
0 | --- target
-50 | ● regressed
-80 | ● before ECO
-20 | ● after ECO
+-------------------------------> ECO iteration
Prove setup AND hold moved safely.STA deep dive
ECO without regression is a coin flip.
Concept diagram
ECO LOOP
failing path -> fix -> setup check -> hold check -> SI -> MMMC matrixMetric graph
ECO PROGRESS
WNS
0 | o target
-50| o
-100| o baseline
+-----------------> ECO #Reports and artifacts
pre/post WNS
hold delta
leakage delta
ECO ticket log
Mini case study
48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.
Debug branches
Never ship setup-only proof
Logical ECO needs equivalence
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
Setup and hold compete through delay changes; closure order and ECO type must avoid fixing one at the expense of the other.
Metric: setup WNS, hold WNS, simultaneous violation count