STA Mastery · All levels
Setup / Hold Closure Order: Mechanism
Mechanism for Setup / Hold Closure Order.
Mechanism to understand
Mechanism for Setup / Hold Closure Order focuses on setup WNS, hold WNS, simultaneous violation count. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
Setup and hold compete through delay changes; closure order and ECO type must avoid fixing one at the expense of the other. Think of STA as a signed contract between constraints, parasitics, and implementation — slack is the measurable outcome.
Identify launch and capture clocks on the failing path.
Identify path group: reg2reg, in2reg, reg2out, or async.
Identify whether setup, hold, or both fail in the scenario.
Layered view
STA CLOSURE FLOW — Setup / Hold Closure Order
constraints (SDC)
|
v
timing graph (cell + net delays)
|
v
MMMC scenarios (corner x mode x view)
|
v
variation + SI adjustments
|
v
slack (WNS/TNS) -> ECO -> regression
Debug rule: always state corner, mode, view, and database tag with slack.Setup vs hold tradeoff
DELAY CHANGE EFFECT
increase cell delay:
setup slack improves (more time before capture)
hold slack worsens (data arrives later vs hold edge)
ECO must check BOTH sides.Layer responsibilities
STA OWNERSHIP LAYERS — Setup / Hold Closure Order
layer owns failure mode
---------------- -------------------------- ---------------------
constraints clocks, IO, exceptions false violations
implementation cells, nets, placement real path delay
extraction SPEF/RC corners view mismatch
signoff policy derate, MMMC matrix margin disputes
closure ECO order, regression fix breaks other cornerSTA deep dive
ECO without regression is a coin flip.
Concept diagram
ECO LOOP
failing path -> fix -> setup check -> hold check -> SI -> MMMC matrixMetric graph
ECO PROGRESS
WNS
0 | o target
-50| o
-100| o baseline
+-----------------> ECO #Reports and artifacts
pre/post WNS
hold delta
leakage delta
ECO ticket log
Mini case study
48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.
Debug branches
Never ship setup-only proof
Logical ECO needs equivalence
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Mechanism deep dive
Setup and hold compete through delay changes; closure order and ECO type must avoid fixing one at the expense of the other.