Setup / Hold Closure Order: Worked Example
Worked Example for Setup / Hold Closure Order.
Worked example
Worked Example for Setup / Hold Closure Order focuses on setup WNS, hold WNS, simultaneous violation count. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
A signoff run shows setup WNS, hold WNS, simultaneous violation count. The first review mistake is to blame implementation without checking constraints. A better review starts by pinning one critical path, proving where slack was lost, and checking whether the SDC rule is correct for Setup / Hold Closure Order.
Sequence under inspection
TIMING PATH — Setup / Hold Closure Order
launch FF --logic stages--> capture FF
| |
launch clock capture clock
| |
required: arrival < capture_edge - setup
metric: setup WNS, hold WNS, simultaneous violation countSetup vs hold tradeoff
DELAY CHANGE EFFECT
increase cell delay:
setup slack improves (more time before capture)
hold slack worsens (data arrives later vs hold edge)
ECO must check BOTH sides.Capture report_timing and the relevant SDC excerpt.
Tag corner, mode, view, and path group.
Find the first cell or net that dominates critical delay.
Compare against setup/hold trend chart, ECO sequence log, path replay.
Choose one reversible ECO and write the regression matrix before editing netlist or constraints.
Did the fix work?
BEFORE / AFTER ECO — Setup / Hold Closure Order
WNS (ps)
0 | --- target
-50 | ● regressed
-80 | ● before ECO
-20 | ● after ECO
+-------------------------------> ECO iteration
Prove setup AND hold moved safely.STA deep dive
ECO without regression is a coin flip.
Concept diagram
ECO LOOP
failing path -> fix -> setup check -> hold check -> SI -> MMMC matrixMetric graph
ECO PROGRESS
WNS
0 | o target
-50| o
-100| o baseline
+-----------------> ECO #Reports and artifacts
pre/post WNS
hold delta
leakage delta
ECO ticket log
Mini case study
48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.
Debug branches
Never ship setup-only proof
Logical ECO needs equivalence
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
Setup and hold compete through delay changes; closure order and ECO type must avoid fixing one at the expense of the other.
Metric: setup WNS, hold WNS, simultaneous violation count