Design Space for SI ECO Fix Order.

Design space exploration

For SI ECO Fix Order, closure options trade margin, schedule, and regression risk.

Option A — conservative

  • Conservative margin: helps safe signoff

  • Risk: over-pessimism, area/power

  • Validate with: first silicon

Option B — balanced

  • Balanced derate: helps reasonable margin

  • Risk: needs approval

  • Validate with: mature node

Option C — aggressive ECO

  • Aggressive ECO: helps fast WNS gain

  • Risk: hold/SI regressions

  • Validate with: late schedule

Option D — RTL restructure

  • RTL restructure: helps structural fix

  • Risk: schedule hit

  • Validate with: chronic paths

diagram
DESIGN SPACE — SI ECO Fix Order
margin <-> performance <-> schedule
pick based on post-ECO SI WNS recovery, reroute count, spacing violations cleared on product scenarios

Design pitfalls

  • ECO without regression matrix

  • Constraint change without audit

Tradeoff curve

diagram
BEFORE / AFTER ECO — SI ECO Fix Order

WNS (ps)
  0 |                    --- target
-50 |    ● regressed
-80 |         ● before ECO
-20 |              ● after ECO
    +-------------------------------> ECO iteration
Prove setup AND hold moved safely.

STA deep dive

Coupling makes delay a function of neighbors, not just wire RC.

Concept diagram

diagram
SI ON VICTIM

victim net delay = base_RC + coupling_from_aggressors

Metric graph

diagram
DELTA DELAY ON CRITICAL PATHS

no SI   ████████  1.2ns
with SI ██████████  1.35ns  (+150ps)

Reports and artifacts

  • delta delay report

  • aggressor list

  • noise peaks

  • SI WNS delta

Mini case study

Setup fixed by upsize but SI worsened — spacing ECO on bus bits recovered margin.

Debug branches

  • Re-run SI after every timing ECO

  • Shield wide switching buses

Senior review question

Ask: what corner/mode/view proves this topic is closed or failing?

Key takeaways

  • State corner, mode, view, and database tag with every slack claim.

  • Run setup and hold plus MMMC regression after every ECO.

Common pitfalls

  • Comparing STA runs with different SPEF or SDC tags.

  • Broad false_path to green-wash violations.

  • Setup-only ECO without hold check.

Principal STA review addendum

SI fixes use spacing, shielding, sizing, and reroute; order matters because a setup fix can worsen hold or noise elsewhere.

Metric: post-ECO SI WNS recovery, reroute count, spacing violations cleared