STA Mastery · All levels
SI ECO Fix Order: Inputs & Outputs
Inputs & Outputs for SI ECO Fix Order.
Inputs and outputs contract
Inputs & Outputs for SI ECO Fix Order focuses on post-ECO SI WNS recovery, reroute count, spacing violations cleared. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
Treat these as a signed interface contract. Ambiguity here is the single biggest source of wasted integration weeks, because two teams debug against different assumptions.
INPUTS
- SDC (clocks, IO delays, exceptions)
- Liberty libraries per corner
- SPEF/parasitics and RC corner
- MMMC scenario definition
OUTPUTS
- WNS/TNS reports per scenario
- path group summaries
- constraint audit / waiver log
- signoff closure memoTiming path sequence
TIMING PATH — SI ECO Fix Order
launch FF --logic stages--> capture FF
| |
launch clock capture clock
| |
required: arrival < capture_edge - setup
metric: post-ECO SI WNS recovery, reroute count, spacing violations clearedOwnership map
OWNERSHIP MAP — SI ECO Fix Order
artifact owner
---------------- -----------------
timing report PD owner
SDC/constraint SI owner
implementation STA lead
Every WNS cluster needs a named owner before ECO.STA deep dive
Coupling makes delay a function of neighbors, not just wire RC.
Concept diagram
SI ON VICTIM
victim net delay = base_RC + coupling_from_aggressorsMetric graph
DELTA DELAY ON CRITICAL PATHS
no SI ████████ 1.2ns
with SI ██████████ 1.35ns (+150ps)Reports and artifacts
delta delay report
aggressor list
noise peaks
SI WNS delta
Mini case study
Setup fixed by upsize but SI worsened — spacing ECO on bus bits recovered margin.
Debug branches
Re-run SI after every timing ECO
Shield wide switching buses
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
SI fixes use spacing, shielding, sizing, and reroute; order matters because a setup fix can worsen hold or noise elsewhere.
Metric: post-ECO SI WNS recovery, reroute count, spacing violations cleared