STA Mastery · All levels
SI ECO Fix Order: Reports & Metrics
Reports & Metrics for SI ECO Fix Order.
Reports and metrics
Reports & Metrics for SI ECO Fix Order focuses on post-ECO SI WNS recovery, reroute count, spacing violations cleared. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
The job of a report is to turn post-ECO SI WNS recovery, reroute count, spacing violations cleared into a closure decision. A single WNS number is almost never enough; you need path group breakdown, cell vs net split, and a clear gap between current slack and signoff target.
Metric movement
METRIC GRAPH — post-ECO SI WNS recovery, reroute count, spacing violations cleared
WNS (ps)
^
| target (0)
| - - - - - - -
| o after ECO + hold check
| o
| o baseline run
| o failing regression
+--------------------------------------> closure iteration
view audit path group fix MMMC signoff
Readout:
- explain why WNS/TNS moved and which path group drove the changeSlack distribution
SLACK HISTOGRAM — SI ECO Fix Order
path count
| ***
| *******
| ***********
|************* <- WNS (worst path)
+--------------------> slack (ns)
-0.15 0.0 0.10
Fix the left tail first; average slack misleads.Track post-ECO SI WNS recovery, reroute count, spacing violations cleared by path group, corner, and analysis view.
Report WNS/TNS and failing endpoint count together.
Include setup and hold splits; they often diverge after ECO.
Always store the metric next to the artifact that produced it.
STA deep dive
Coupling makes delay a function of neighbors, not just wire RC.
Concept diagram
SI ON VICTIM
victim net delay = base_RC + coupling_from_aggressorsMetric graph
DELTA DELAY ON CRITICAL PATHS
no SI ████████ 1.2ns
with SI ██████████ 1.35ns (+150ps)Reports and artifacts
delta delay report
aggressor list
noise peaks
SI WNS delta
Mini case study
Setup fixed by upsize but SI worsened — spacing ECO on bus bits recovered margin.
Debug branches
Re-run SI after every timing ECO
Shield wide switching buses
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.