STA Mastery · All levels

SI ECO Fix Order: Reports & Metrics

Reports & Metrics for SI ECO Fix Order.

Reports and metrics

Reports & Metrics for SI ECO Fix Order focuses on post-ECO SI WNS recovery, reroute count, spacing violations cleared. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.

The job of a report is to turn post-ECO SI WNS recovery, reroute count, spacing violations cleared into a closure decision. A single WNS number is almost never enough; you need path group breakdown, cell vs net split, and a clear gap between current slack and signoff target.

Metric movement

diagram
METRIC GRAPH — post-ECO SI WNS recovery, reroute count, spacing violations cleared

WNS (ps)
  ^
  |                         target (0)
  |                       - - - - - - -
  |                  o after ECO + hold check
  |              o
  |         o baseline run
  |    o failing regression
  +--------------------------------------> closure iteration
    view audit     path group fix     MMMC signoff

Readout:
  - explain why WNS/TNS moved and which path group drove the change

Slack distribution

diagram
SLACK HISTOGRAM — SI ECO Fix Order

path count
  |      ***
  |    *******
  |  ***********
  |*************  <- WNS (worst path)
  +--------------------> slack (ns)
  -0.15  0.0  0.10

Fix the left tail first; average slack misleads.
  • Track post-ECO SI WNS recovery, reroute count, spacing violations cleared by path group, corner, and analysis view.

  • Report WNS/TNS and failing endpoint count together.

  • Include setup and hold splits; they often diverge after ECO.

  • Always store the metric next to the artifact that produced it.

STA deep dive

Coupling makes delay a function of neighbors, not just wire RC.

Concept diagram

diagram
SI ON VICTIM

victim net delay = base_RC + coupling_from_aggressors

Metric graph

diagram
DELTA DELAY ON CRITICAL PATHS

no SI   ████████  1.2ns
with SI ██████████  1.35ns  (+150ps)

Reports and artifacts

  • delta delay report

  • aggressor list

  • noise peaks

  • SI WNS delta

Mini case study

Setup fixed by upsize but SI worsened — spacing ECO on bus bits recovered margin.

Debug branches

  • Re-run SI after every timing ECO

  • Shield wide switching buses

Senior review question

Ask: what corner/mode/view proves this topic is closed or failing?

Key takeaways

  • State corner, mode, view, and database tag with every slack claim.

  • Run setup and hold plus MMMC regression after every ECO.

Common pitfalls

  • Comparing STA runs with different SPEF or SDC tags.

  • Broad false_path to green-wash violations.

  • Setup-only ECO without hold check.

Reading reports