SI ECO Fix Order: Worked Example
Worked Example for SI ECO Fix Order.
Worked example
Worked Example for SI ECO Fix Order focuses on post-ECO SI WNS recovery, reroute count, spacing violations cleared. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
A signoff run shows post-ECO SI WNS recovery, reroute count, spacing violations cleared. The first review mistake is to blame implementation without checking constraints. A better review starts by pinning one critical path, proving where slack was lost, and checking whether the SDC rule is correct for SI ECO Fix Order.
Sequence under inspection
TIMING PATH — SI ECO Fix Order
launch FF --logic stages--> capture FF
| |
launch clock capture clock
| |
required: arrival < capture_edge - setup
metric: post-ECO SI WNS recovery, reroute count, spacing violations clearedSI fix priority
SI ECO ORDER
1. spacing / shield on worst aggressors
2. victim upsize (if delta delay)
3. reroute victim to quiet layer
4. re-run SI + setup + hold matrixCapture report_timing and the relevant SDC excerpt.
Tag corner, mode, view, and path group.
Find the first cell or net that dominates critical delay.
Compare against ECO change list, before/after SI report, regression matrix.
Choose one reversible ECO and write the regression matrix before editing netlist or constraints.
Did the fix work?
BEFORE / AFTER ECO — SI ECO Fix Order
WNS (ps)
0 | --- target
-50 | ● regressed
-80 | ● before ECO
-20 | ● after ECO
+-------------------------------> ECO iteration
Prove setup AND hold moved safely.STA deep dive
Coupling makes delay a function of neighbors, not just wire RC.
Concept diagram
SI ON VICTIM
victim net delay = base_RC + coupling_from_aggressorsMetric graph
DELTA DELAY ON CRITICAL PATHS
no SI ████████ 1.2ns
with SI ██████████ 1.35ns (+150ps)Reports and artifacts
delta delay report
aggressor list
noise peaks
SI WNS delta
Mini case study
Setup fixed by upsize but SI worsened — spacing ECO on bus bits recovered margin.
Debug branches
Re-run SI after every timing ECO
Shield wide switching buses
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
SI fixes use spacing, shielding, sizing, and reroute; order matters because a setup fix can worsen hold or noise elsewhere.
Metric: post-ECO SI WNS recovery, reroute count, spacing violations cleared