STA Mastery · All levels
SI Signoff Reports: Step-by-Step Walkthrough
Step-by-Step Walkthrough for SI Signoff Reports.
Step-by-step analysis walkthrough
Use when you own SI Signoff Reports in a timing war room.
Open signoff scenario list — note worst WNS corner.
report_timing -max/-min on failing group.
Trace launch and capture clocks on critical path.
Check exceptions and generated clocks on path.
Break down cell vs net delay.
Compare implementation vs signoff view if delta suspicious.
Assign owner: RTL, synth, PD, CTS, SI.
Propose ECO with hold/SI check plan.
Run regression matrix.
Update closure dashboard and memo.
Artifacts to collect
SI signoff summary, foundry SI checklist, waiver log
SDC file
SPEF tag
MMMC scenario list
ECO ticket
Decision memo template
STA DECISION MEMO — SI Signoff Reports
corner/mode:
WNS/TNS:
hypothesis:
ECO:
regression:
owners: SI lead, STA lead, signoff ownerReference visuals
SI signoff summary
SI SIGNOFF DASHBOARD
delta delay violations : 12 (owner: PD)
noise violations : 3 (owner: SI)
waivers pending : 1 (owner: STA lead)STA deep dive
Coupling makes delay a function of neighbors, not just wire RC.
Concept diagram
SI ON VICTIM
victim net delay = base_RC + coupling_from_aggressorsMetric graph
DELTA DELAY ON CRITICAL PATHS
no SI ████████ 1.2ns
with SI ██████████ 1.35ns (+150ps)Reports and artifacts
delta delay report
aggressor list
noise peaks
SI WNS delta
Mini case study
Setup fixed by upsize but SI worsened — spacing ECO on bus bits recovered margin.
Debug branches
Re-run SI after every timing ECO
Shield wide switching buses
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
SI signoff aggregates delta delay and noise against foundry rules and product margin; reports must map to fix ownership.
Metric: SI-clean path %, remaining aggressor violations, signoff waiver count