STA Mastery · All levels
SI Signoff Reports: Worked Example
Worked Example for SI Signoff Reports.
Worked example
Worked Example for SI Signoff Reports focuses on SI-clean path %, remaining aggressor violations, signoff waiver count. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
A signoff run shows SI-clean path %, remaining aggressor violations, signoff waiver count. The first review mistake is to blame implementation without checking constraints. A better review starts by pinning one critical path, proving where slack was lost, and checking whether the SDC rule is correct for SI Signoff Reports.
Sequence under inspection
TIMING PATH — SI Signoff Reports
launch FF --logic stages--> capture FF
| |
launch clock capture clock
| |
required: arrival < capture_edge - setup
metric: SI-clean path %, remaining aggressor violations, signoff waiver countSI signoff summary
SI SIGNOFF DASHBOARD
delta delay violations : 12 (owner: PD)
noise violations : 3 (owner: SI)
waivers pending : 1 (owner: STA lead)Capture report_timing and the relevant SDC excerpt.
Tag corner, mode, view, and path group.
Find the first cell or net that dominates critical delay.
Compare against SI signoff summary, foundry SI checklist, waiver log.
Choose one reversible ECO and write the regression matrix before editing netlist or constraints.
Did the fix work?
BEFORE / AFTER ECO — SI Signoff Reports
WNS (ps)
0 | --- target
-50 | ● regressed
-80 | ● before ECO
-20 | ● after ECO
+-------------------------------> ECO iteration
Prove setup AND hold moved safely.STA deep dive
Coupling makes delay a function of neighbors, not just wire RC.
Concept diagram
SI ON VICTIM
victim net delay = base_RC + coupling_from_aggressorsMetric graph
DELTA DELAY ON CRITICAL PATHS
no SI ████████ 1.2ns
with SI ██████████ 1.35ns (+150ps)Reports and artifacts
delta delay report
aggressor list
noise peaks
SI WNS delta
Mini case study
Setup fixed by upsize but SI worsened — spacing ECO on bus bits recovered margin.
Debug branches
Re-run SI after every timing ECO
Shield wide switching buses
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
SI signoff aggregates delta delay and noise against foundry rules and product margin; reports must map to fix ownership.
Metric: SI-clean path %, remaining aggressor violations, signoff waiver count