Debug playbook
Debug Playbook for Derate Policy & Approval focuses on approved derate set, waiver count, signoff pessimism budget. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
STA debug is a search for the FIRST deviation, not the loudest downstream symptom. Hold failures after setup ECO are a classic example of fixing the wrong layer first.
Root-cause tree
ROOT-CAUSE TREE — Derate Policy & Approval
approved derate set, waiver count, signoff pessimism budget looks wrong
|
same netlist tag?
/ \
no yes
| |
view/SDC real path or
mismatch constraint bug
/ \ |
lib SPEF delay breakdown
diff diff cell vs netFreeze the failing netlist tag, SDC revision, and SPEF corner.
Find the first constraint or delay anomaly on the critical path.
Map the path to launch/capture clocks and path group.
Classify the failure: constraint bug, view mismatch, cell delay, net delay, or SI.
Prove the mechanism with one reduced path or isolated scenario.
Patch the smallest owner-controlled fix and rerun setup, hold, and MMMC.
Review memo template
STAFF STA REVIEW MEMO — OCV, AOCV, POCV & Variation / Derate Policy & Approval
1. Symptom
- Watched metric: approved derate set, waiver count, signoff pessimism budget
- Failing scenario: <corner/mode/view>
- Path group: <reg2reg / in2reg / reg2out / async>
- Database tags: <netlist, SDC, SPEF, lib>
2. Mechanism hypothesis
- Primary mechanism: Derating policy is a contractual margin between implementation and signoff; changes need documented approval and regression.
- Competing hypothesis: <constraint bug, view mismatch, cell delay, net delay, SI>
- Missing evidence: <report_timing, clock report, constraint trace>
3. Proposed action
- Minimal reversible change: <SDC fix, sizing, VT swap, route, useful skew>
- Expected metric movement: <WNS/TNS delta>
- Regression risk: hold, other corners, SI, leakage
4. Signoff
- Re-run artifact: derate approval memo, signoff policy PDF, before/after WNS comparison
- Required owners: STA lead, PD director, foundry signoff
- Final decision: ECO, waive, constraint fix, or escalateSTA deep dive
Variation policy is negotiated margin, not a tool checkbox.
Concept diagram
VARIATION STACK
nominal delay + OCV/AOCV/POCV margin = signoff delayMetric graph
DERATE IMPACT ON WNS
OCV only WNS -120ps
AOCV WNS -45ps
POCV WNS -60ps (policy dependent)Reports and artifacts
derate table
AOCV depth report
POCV sigma
hold/setup split
Mini case study
Switched to AOCV without re-baselining hold — short paths failed min analysis.
Debug branches
Short paths for hold
Policy approval for derate changes
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
Derating policy is a contractual margin between implementation and signoff; changes need documented approval and regression.
Metric: approved derate set, waiver count, signoff pessimism budget