The effect of variation on a path depends on its depth. A simulation shows the averaging directly. Short paths, typical of hold, see a large relative spread; deep paths, typical of setup, a small one. Clock paths add variation of their own, partly cancelled by common path removal. The topic closes with a worked comparison of flat, depth-based and statistical analysis over twenty paths.
Lesson | After it you can... |
|---|---|
Show the 1/sqrt(n) averaging with a simulation. | |
Compare derate cost on hold and setup paths. | |
Quantify skew uncertainty from variation. | |
Compare three methods on twenty paths. |
The 1-stage path: relative spread falls as one over the square root of the stage count, so the 16-stage path has a quarter of it.